Maico Centro-E Installation And Operating Instructions Manual Download Page 8

11 Cleaning, maintenance

8

switch. Demand-based ventilation after start delay
of approx. 1 minute. Overrun time after switching
off, approx. 3 minutes.
Control of the volumetric air flows within the vent-
ilation system with Centro pressure controller.
Speed control of the central fan automatically.

Centro-H

Exhaust air element with servomotor and humidity
control. For use in systems with variable volumet-
ric flow for individual apartments. Standard opera-
tion – basic ventilation, automatic switchover to
full load if required (switch-on/switch-off point ad-
justable). Demand-based ventilation can also be
switched on by light switch.
Control of the air volume flows within the ventila-
tion system by pressure or speed control of the
central fan.
Once the exhaust air element has been installed,
the unit regulates to the current room humidity
(relative humidity). This humidity value is saved
as the first reference value. The reference value
does not have to be specified manually. If the
room humidity rises by 7 % within 2 minutes, the
exhaust air element switches to full load operation
(demand-based ventilation). If the relative humid-
ity falls below the reference value during opera-
tion, the newly established reference value is
saved. The exhaust air element then automatic-
ally switches back to base load operation or to
Off. Demand-based ventilation automatically or
via a switch (e.g. light switch). After manual
switch-on (light switch) the exhaust air element
runs with a start delay of approx. 1 minute with
demand-based ventilation (full load). After manual
switch-off, the exhaust air element continues to
run in nominal load operation with an overrun
time of 15 minutes (valve closing time approx. 2 -
3 minutes).

 When switch is open, the exhaust air ele-

ment can start up automatically as a result of
high room humidity.

11 Cleaning, maintenance

The unit is practically maintenance-free. The air
filter must be replaced 

every 3 to 6 months

, de-

pending on the degree of soiling.

 Replacement filter mats ZF 60/100 

5-pack,

filter class G2 according to EN 779, art. no.
0093.0331 + filter change indicator (time strip)
For filter change and cleaning → ER UP/Centro
main instructions.

12 Fault rectification

 Fault finding and repairs only permissible

when carried out by qualified electricians.

 DANGER Danger to life from electric

shock.

Prior to accessing the connection terminals,
switch off all supply circuits. Switch off mains
fuse, secure against being accidentally switched
back on and position a visible warning sign.

Summary of Contents for Centro-E

Page 1: ...Installation and operating instructions Flush mounted exhaust air elements for Centro centralised ventilation system according to DIN 18017 3 Centro M Centro E Centro H www maico ventilatoren com...

Page 2: ...s 4 6 Technical data 4 6 1 Environmental conditions and oper ating limits 4 6 2 Regulations for operation with fire places 4 6 3 Technical data table 5 6 4 Storage 5 7 Mounting preparations 5 8 Instal...

Page 3: ...ate in terior bathrooms toilet rooms and open plan kit chens with exterior windows storage rooms etc After completion of the interior building work the exhaust air elements are inserted into the flush...

Page 4: ...d housing Shaft level difference according to DIN 4109 tested by IAB Oberursel The Institute for Acoustics and Building Physics in Germany Cover with exhaust air filter and time strip Air filters are...

Page 5: ...table dry room Ambient temperature 10 C to 60 C Maico accepts no liability for corrosion damage caused by improper storage e g storage in a damp environment 7 Mounting preparations Suitable mounting m...

Page 6: ...sk of damage if ESD sensitive com ponents on the board are touched Avoid direct touching of the components or con tact surfaces NOTICE The noise level will increase if the housing floor seal is fitted...

Page 7: ...y first fit a spacing or wall frame 3 With second room extraction insert regulating plate below locking tabs at the side on the in take grille of the cover insert filter mat 4 Lock cover The lock must...

Page 8: ...reference value during opera tion the newly established reference value is saved The exhaust air element then automatic ally switches back to base load operation or to Off Demand based ventilation aut...

Page 9: ...15 minutes and resets the refer ence value Additional consumers connected to terminal 4 Damage to the unit if connected incorrectly Do not connect addi tional consumers to ter minal 4 The unit may onl...

Page 10: ...rior to accessing the connection terminals switch off all supply circuits Switch off mains fuse secure against being accidentally switched back on and position a visible warning sign 1 Remove spiral h...

Page 11: ...Notes...

Page 12: ...Maico Elektroapparate Fabrik GmbH Steinbeisstr 20 78056 Villingen Schwenningen Deutschland Service 49 7720 6940 info maico de D07 21_EN_DSW AV...

Reviews: