8 Mounting preparations

10

8.3 Preparations for installation with
fire protection requirements

NOTICE Damage to unit, malfunctioning in the
event of corrosion damage from mortar.

Wrap ventilation ducts, connected to the unit,
with a suitable adhesive tape to protect against
corrosion inside the brickwork, e.g. using cold-
shrink tape.

8.3.1 Preparations for wall installation (with
fire protection)

12

Main duct (steel folded spiral-seams
duct)

13

Spigot

14

Shaft wall

15

Ceiling compound

16

Floor ceiling

17

Connection duct: Flexible aluminium
duct AFR 80

18

Sealing material, e.g. cold-shrink tape

 It is essential that requirements in line with

approval are observed

 (

Requirements in line

with approval [

}

 9]

).

NOTICE Damage to unit, malfunctioning in the
event of corrosion damage from mortar.

Wrap ventilation ducts, connected to the unit,
with a suitable adhesive tape to protect against
corrosion inside the brickwork, e.g. using cold-
shrink tape.

1. Correctly attach main ventilation duct inside

the shaft.

2. Apply ceiling compound. To do this, encase

the ceiling and pour in the material from
above.

3. Make a wall or shaft opening for the flexible

aluminium duct.

 DANGER Danger to life due to fire trans-

mission in case of faulty ceiling compound.

It is essential that the remaining gap between the
main duct and the wall or ceiling is completely
sealed with non-flammable materials that are res-
istant to deformation. For example, use concrete
or cement mortar.

4. Connect the flexible aluminium duct to the

main duct and seal for ventilation.

5. Cut flexible aluminium duct to length, observe

a maximum duct length of 2 m.

Dimension the length of the flexible alu-
minium duct so that it protrudes from the
wall or shaft so that the connection socket
can be attached later. Also attach a ventila-
tion seal on the unit side.

6. Ensure a suitable, level substructure.

Compensate any unevenness in the wall or
ceiling so that the housing can be installed
without warping. Otherwise it may be that
the fan insert can no longer be inserted into
the housing or that the degree of protec-
tion indicated on the rating plate is no
longer guaranteed.

7. Attach spigot made from shaft material F90

around the shaft.

The spigot compensates for the length of
the shaft walls in the event of a fire.

8. Continue with the safety test of the APB shut-

off device: 

Safety instructions for installation of

the fire protection shut-off device [

}

 12]

.

8.3.2 Preparations for ceiling installation (with fire protection)

(Connection outside of the shaft)

Summary of Contents for Centro-E-APB

Page 1: ...Installation and operating instructions Surface mounted system for centralised ventilation in ac cordance with DIN 18017 3 Centro M APB Centro E APB Centro H APB www maico ventilatoren com...

Page 2: ...preparations 9 8 1 Requirements in line with approval 9 8 1 1 Approval provisions 9 8 2 Permitted installation positions 9 8 3 Preparations for installation with fire protection requirements 10 8 3 1...

Page 3: ...3 Preface Please read the instructions carefully before in stalling and using for the first time Follow the in structions Pass these instructions on to the owner for safekeeping Overview of Centro APB...

Page 4: ...ci ated with electricity on the basis of your technical training and experience 3 Intended use Centro APB exhaust air elements are intended for use in central ventilation systems with a common main du...

Page 5: ...shock If the unit is open all off the supply circuits must be switched off mains fuse off secured against being accidentally switched back on and a visible warning sign must be attached Only operate t...

Page 6: ...mulate harmful substances mould germs etc This may also happen if the unit is shut down for an extended period If the air filter is missing the unit and air ducts become soiled Never operate the unit...

Page 7: ...y relative humidity This hu midity value is saved as the first reference value The reference value does not have to be spe cified manually If the room humidity rises by 7 within 2 minutes the exhaust...

Page 8: ...ch the air is to be extracted must be fitted with a non closable free supply air cross section of at least 150 cm e g with MLK door ventilation grille Centro E APB and Centro H APB with resist ance to...

Page 9: ...duct between the main duct in the shaft and the unit max 2 m long ap proval Duct elbows in the unit con nection duct Max 90 bend ascending Number of duct elbows permit ted for wall installation Max 1...

Page 10: ...DANGER Danger to life due to fire trans mission in case of faulty ceiling compound It is essential that the remaining gap between the main duct and the wall or ceiling is completely sealed with non fl...

Page 11: ...r bolt steel dowel 27 2 Metal expansion dowel 28 Retaining bolt with nut 29 Retaining bolt 30 Steel clamping band Keep a maximum distance of 1 5 m between the duct fastenings It is essential to observ...

Page 12: ...mmable materials that are resistant to de formation For example use concrete or ce ment mortar or for wall boards use fire protec tion filler 7 Fasten duct bends with 3 steel screws or 3 steel blind r...

Page 13: ...socket is incorrectly con nected to the connection duct Make the connection in accordance with these in structions and the general building approval 3 steel blind rivets are prescribed for the connec...

Page 14: ...It is es sential that the permissible installation posi tions are observed 3 Drill fixing holes and insert dowels Suitable mounting material is to be provided by the customer 4 Check ease of movement...

Page 15: ...r rectly all the way round 10 Slide connection duct up to stop above ex haust socket Connection between connection duct and exhaust socket must be leak tight use cold shrink tape for example Prescribe...

Page 16: ...of incorrect installation if non permitted mounting material is used Only secure connection duct to ceiling with per mitted mounting material duct clamp or clamping band Prescribed mounting material...

Page 17: ...ning sign DANGER Danger from electric shock The unit will be damaged if installed incorrectly with too long a power cable If the cable feed is too long inside the housing the fan insert cannot be inst...

Page 18: ...PB with fixed air volume setting for basic ventilation 8 Sealing 10 2 Shut off shutter 36 38 Locking tabs 37 Locking lever 2 Switch off mains fuse and fit warning sign 3 Check ease of movement of shut...

Page 19: ...n A all the way The red dye in the interior of the bar B is released The bar indicator first fills slightly Within the next 6 months the bar indicator B will rise to the upper edge indicator value 6 1...

Page 20: ...ocking tabs 37 Locking lever 38 Locking tabs 1 Switch off mains fuse secure and fit warning sign 2 Remove cover and upper part of housing 3 Press locking lever slightly to the left arrow I release and...

Page 21: ...o not connect addi tional consumers to ter minal 4 The unit may only be connected according to the wiring diagrams Wiring diagrams 22 If the fault persists or reoccurs Disconnect the unit completely f...

Page 22: ...estic waste Dispose of the packaging material in an environ mentally friendly way in compliance with the reg ulations valid in the country where you are Dispose of the air filter in an environmentally...

Page 23: ...erence value does not have to be specified manually If the room humidity rises by 7 within 2 minutes the exhaust air element switches to full load operation demand based ventilation If the relative hu...

Page 24: ...Maico Elektroapparate Fabrik GmbH Steinbeisstr 20 78056 Villingen Schwenningen Deutschland Service 49 7720 6940 info maico de D11 21_EN_DSW AV...

Reviews: