Maico 0084.0361 Installation And Operating Instructions Manual Download Page 10

9 Fan insert

10

9 Fan insert

10 Accommodation

mount

11 Stud with locking

hook

12 Sealing plug

13 Fan insert

X Locking hook

Y Fixing holes for

alternative screw
fixings

The fan insert is delivered separately. Installation
takes place in the completion stage. 

 Opera-

tion of the ER EC unit during the shell con-
struction phase is not permissible.

9.1 Installation of fan insert

1. Before accessing the connection terminals,

shut down all supply circuits (switch off mains
fuse), secure against being accidentally
switched back on and position a visible warn-
ing sign.

2. Remove plaster protective cover and clean ER

GH housing of construction soiling if neces-
sary.

3. Check wiring diagram sticker for correctness

of the ticked fan type.

4. Check ease of movement of shutter. When in-

stalled, it must close automatically.

5. Check that connection data matches the tech-

nical data on the unit ( → rating plate).

6. Plug the fan insert directly into the 3 studs with

locking hooks. Make sure that the fan insert
audibly clicks into all 3 snap-fit fasteners.

7. Check for firm seating of the fan insert. To do

this, gently pull/press on the fan insert. It must
not move.

NOTICE Function will be impaired if fan insert
is not inserted correctly.

Ensure proper insertion in the locking hooks.
If the fan insert is not firmly seated, screw it to the
housing at the 3 positions shown in the figure
above. Suitable mounting material is to be
provided by the customer.

9.2 Commissioning

1. Switch on mains fuse and remove warning

sign.

2. Run function test.

3. Check that the unit is running smoothly.

4. During the shell phase, switch off mains fuse,

secure against being accidentally switched
back on and position a visible warning sign.

Summary of Contents for 0084.0361

Page 1: ...Installation and operating instructions ER EC covers for ER EC flush surface mounted exhaust air systems according DIN 18017 3 ER A ER AK ER AH ER AB www maico ventilatoren com...

Page 2: ...3 Technical data table 9 8 4 Storage 9 9 Fan insert 10 9 1 Installation of fan insert 10 9 2 Commissioning 10 9 3 Removing fan insert 11 10 Installing the cover ER A ER AK ER AH ER AB 11 11 Operating...

Page 3: ...s ER A Article no 0084 0361 Standard cover Lower and upper part of cover TimeStrip on title page of these instructions ER AK Article no 0084 0362 Comfort cover Lower and upper part of cover ER AH Arti...

Page 4: ...le page ER AK comfort cover 1 Cover upper part 4 Cover lower part with touch control unit Cover with ER AH humidity control 1 Cover upper part 5 Cover lower part with touch control unit 6 Humidity sen...

Page 5: ...NGER Indicates a possibly hazardous situation which will result in death or serious injuries if not avoided WARNING Indicates a possibly hazardous situation which could result in death or serious inju...

Page 6: ...f the relevant regula tions for electrical installations are not ob served Before removing the housing cover or removing the fan insert and before installing the electrics switch off all supply circui...

Page 7: ...ble to rotate the cover by 5 to com pensate for housings which have been fitted at an angle ER AH and ER AB are barrier free products In automatic mode they switch the fan automatic ally on and off ER...

Page 8: ...oad 20 m h 30 m h or 100 m h Full load level on off via light switch or separate switch During manual operation e g using light switch the start delay and overrun time apply Full load operation 60 m h...

Page 9: ...ia drawn up by the respons ible regional master chimney sweep are met Parallel operation of air ventilated fireplaces for liquid or gaseous fuels and air extracting equip ment can be prevented using s...

Page 10: ...vement of shutter When in stalled it must close automatically 5 Check that connection data matches the tech nical data on the unit rating plate 6 Plug the fan insert directly into the 3 studs with loc...

Page 11: ...entral screw If in stalling on a wall ensure that the Maico name is on the bottom right 4 Insert air filter and fold down the upper part of the cover upper part must audibly engage 5 Run function test...

Page 12: ...the next 6 months 11 1 2 Changing setting parameters LEDs 1 flashe s 1 2 3 4 5 V1 20 30 40 60 100 V2 20 60 30 100 40 60 100 Te 0 30 60 90 120 Ta 0 3 6 15 24 30 Ti 0 1 2 4 6 12 Additional setting valu...

Page 13: ...ved If the humidity does not fall below the refer ence value within 60 minutes the unit switches to the set overrun mode and then switches off In the case of Light on the unit starts up If the light i...

Page 14: ...art no 0093 0923 13 Fault rectification Fault finding and repairs only permissible when carried out by qualified electricians Fault Cause Measure Fan performance inad equate Dirty filter Replace filt...

Page 15: ...AH and ER AB Article no 0093 0759 100x ZF EC replacement air filters filter class G2 ZRF replacement air filter for ER ZR second room connection set Article no 0093 0923 5x replacement air filters fo...

Page 16: ...Maico Elektroapparate Fabrik GmbH Steinbeisstr 20 78056 Villingen Schwenningen Deutschland Service 49 7720 6940 info maico de D06 21_EN_DSW AS AV...

Reviews: