![MAHA ZS SQUARE II 3.5 Original Operating Instructions Download Page 29](http://html1.mh-extra.com/html/maha/zs-square-ii-3-5/zs-square-ii-3-5_original-operating-instructions_3723645029.webp)
BA322301-en
29
4.5
Emergency Lowering
In the event of an electrical or mechanical malfunction, two emergency lowering
options are available for the lift.
4.5.1
Electric Emergency Lowering
The electric emergency lowering is identical for all lifts.
1 Set the main switch on the control box to position "0".
2 Open the control box.
3 Pull the standard plug (B, C) from the 4-pin connector block marked X5 (A)
and insert the plug of the emergency stop cable X5.1 (D) in its place.
4 Clamp the other end of the emergency lowering cable (E) with the alligator
clips to two car batteries (12 V) connected in series.
5 The lift can be lowered via the control element (F).
WARNING
In the event of an emergency lowering, the safety devices of the lift are
completely or partially overridden. Emergency lowering may only be performed
by trained personnel.
The lift must not be put back into operation until the fault has been rectified.
A
B
C
D
Summary of Contents for ZS SQUARE II 3.5
Page 16: ...16 BA322301 en 2 4 3 Set up Diagrams...
Page 32: ...32 BA322301 en B B 3 4 B C 5...
Page 52: ...20 PL670000_002 de...