22
BA322301-en
4.2
Preparations
4.2.1
Initial Position/Ready for Operation
•
The main switch must be at position 0.
•
The lift must be lowered all the way down.
Preparing the support: Flat head support
•
The pull-outs must rest fully on the flat head support.
•
The grooved pin mounted in the flat support must engage in the pull-out.
Preparing the support: Swing arm support
•
The support arms must be swiveled completely out of the working area.
4.2.2
Positioning of the Vehicle
1 Carefully drive the vehicle forward and centrally between the lifting units
and secure it against rolling away.
2 The vehicle's centre of gravity should be as centered as possible between
the lifting units.
Summary of Contents for ZS SQUARE II 3.5
Page 16: ...16 BA322301 en 2 4 3 Set up Diagrams...
Page 32: ...32 BA322301 en B B 3 4 B C 5...
Page 52: ...20 PL670000_002 de...