150331_IOM_GS_PE-LMD_BASIKA_rho_gb
10 von 30
ADVICE:
All lines need to be stress-free and equipped with isolated distance clamps. Loads of pipes
(also if made of plastic) and fittings must be supported at site!
•
If a tap water system is used to fill the container the connection to ensure filling in
gravity fall needs to comply with DIN 1988-4. If a Basika filling unit is used a stop valve
and a throttle which has to be pre-adjusted needs to be placed in front of the filling unit.
6.2 Electric Installation
When the sanitary installation has been finished an electrician will connect the electric line
(if available) in the control panel.
Only a competent electrician may do the electric connection.
Supply line:
Three phase current = 400 V, 3 phases, N, PE, 50 cycles
Required Fuse:
(see data sheet for installation, operation and maintenance)
Prior to commissioning an expert needs to make sure that one of the necessary electric
protective measures is available. Grounding, protective multiple earthing, differential
current-switching, etc. need to comply with the prescriptions of the local electric utility
(EVU) and operate perfectly when the electrician runs the function test.
WARNING!
Cross section and voltage drop of the power line need to comply with the VDE
prescriptions.
The voltage mentioned in the electric documentation needs to comply with the existing
power line. The electrician needs to connect the feeder as well as the cables of the
individual devices to the terminals of the control panel according to the wiring diagram (in
the control panel) of the individual control panel.
The feeder needs to be protected by a sufficiently dimensioned and slow-blowing fuse
(according to the nominal power of the total wattage).
ADVICE
The motor overload switches in the control panel are pre-adjusted correctly. Please ask
the responsible electrician at your site.