Maguire Products, Inc.
Rev. December 18, 2019
– ULTRA-1000 Touchscreen
23
ULTRA By Maguire
- Ultra Low Energy Dryer
Start Up and Operation
This section will help you understand what the dryer is doing during operation from a cold start.
There are 3 concurrent operations. Heating, Vacuum and, Retention. Cold startup begins with
Preheat. Preheat only occurs before the first cycle of the dryer’s initial startup, otherwise each
cycle begins with material heating. The vacuum operation pulls and holds a vacuum on the
material for at least the Vacuum Time Set-point (or longer if material remains in the Retention
Hopper). The Retention operation holds the dried material in the Retention Hopper, blanketing
the material with hot, dry air, until the material is conveyed away.
Important:
Inspect the ULTRA dryer, verify that machine is clear of all material from all tanks,
heating hopper, Vacuum Chamber and Retention Hopper. To facilitate a Clean Out, use the
Clean Out function accessible from the home screen.
Startup and Operation Instructions
1. ENSURE HATCH IS CLOSED
. There is a hatch
located on the upper Heating Hopper. Ensure all 3
latches are closed. Also be sure the removable
Lower Retention Hopper is in place.
2. Load material into the Upper Heating Hopper.
Wait for the Heating Hopper to fill with material
before starting the Dryer.
3. Turn on Main Power
by rotating the 60 AMP Main
Disconnect Handle to the Red ON position. This
powers up the ULTRA-1000 Dryer.
On initial power up of the ULTRA dryer, the Control
Panel powers ON automatically. If the main power
is ON but the Control Panel is OFF, press and hold
the Red Power Button located on the Control Panel
for 2 seconds. (Note: The ULTRA
’s Control Panel
can be powered OFF without powering down the
Main Power by pressing and holding the Red
Power button for 4 seconds).