52
MPB-311
Mounting
7.8.1
Mounting the base with 2 railings and the cage half with blocking bracket
1. Pull supply lines for the induction loops through the support of the base.
2. Mounting base with two railings. For this, the delivery includes screws in two
different lengths. Install the screws alternatingly. There must be a long screw
between two short screws.
2
3
4
3
1
3
2
5
1
1
Mag01086a
Fig. 22:
Mounting base with two railings
1 Base with two handrails
2 Screw M10x25
3
Washer
4
Screw M10x22
5 Spring washer
Summary of Contents for MPB-311
Page 115: ...115 MPB 311 MPB 311...