37
MPB-311
Mounting
7.4
Specifying the mounting position
The pedestrian gate can be supplied in the following variants: "Entrance side right"
(MPB-xxxB) and "Entrance side left" (MPB-xxxA).
The layout of the components depends on the version ordered. The service door in
the support beam should point towards the zone controlled.
7.5
Building the foundation and laying empty conduits
7.5.1
Foundation requirements
The foundation must meet the following requirements:
›
Have sufficient load-carrying capacity
›
Concrete C20/25 or corresponding industrial floor
›
Fastening must have a secure grip
›
Foundation cross-section according to foundation and empty conduit plan
›
Non-slip surface
›
Horizontal and level.
Foundation and empty conduit plans:
When installing outdoors, the foundation must meet the following additional
requirements:
›
Concrete C35/45 XD 3 XF2 with reinforcement
›
Foundation depth: at least 800 mm, frost-proof.
Adapt the foundation depth to the local conditions.
Summary of Contents for MPB-311
Page 115: ...115 MPB 311 MPB 311...