
Installation
Facilities Connections
MagneMover LITE User Manual
61
Rockwell Automation Publication MMI-UM002E-EN-P - March 2016
NOTE:
When using multiple network switches to connect all Node Controllers, use
one switch as a master and connect all other switches to it as shown in
.
When using multiple MMI PoE network switches, connect the Uplink from
each switch to a master switch as shown in
the PoE switches.
When using the optional SYNC IT controllers, use a switch dedicated to
those controllers connected directly to the EtherNet/IP port on the PLC dedi-
cated to synchronization as shown in
.
2.
Connect a cable for network communications from the switch to each Node Controller.
•
For NC-12 Node Controllers, connect to ETHERNET as shown in
.
•
For Node Controller LITEs, connect to LAN as shown in
.
3.
Set the IP address for each Node Controller. Refer to the
Node Controller Web Inter-
face User’s Manual
for more details. If EtherNet/IP is being used refer to the
Magne-
Mover
®
LITE Configurator User’s Manual
for additional configuration information.
4.
Configure one Node Controller as a High Level Controller. Refer to the
Node Control-
ler Web Interface User’s Manual
for more details.
Electrical Connections
Electrical power is connected to the MagneMover LITE transport system for operation of the
motors and other subsystems. An AC electrical connection is provided on those components
that require facility power. Refer to the
for electrical
requirements. Ensure that all electrical connections are for the appropriate voltage and power
rating.
1.
Connect power to each NC-12:
•
Connect the AC power cable from either the optional remote power supply or a
user-supplied power supply to the power distribution from the facility’s main
NOTICE
Do not turn on facility power until all installation procedures have been
completed.
NOTICE
The NC-12 Node Controller does not support Power over Ethernet
(PoE). Never connect these Node Controllers to a powered Ethernet
network as damage to internal components may result.