
INSTALLATION OF THE MACHINE
REVISIONE: X51-1213 EN
15
MAGIDO GROUP S.r.l.
Main machine views
1
Lateral spray tube
13
exhaust fumes
2
Basket
14
Pump 1
3
Lid handle
15
Gear motor (opt. su L101 e L102)
4
Lid
16
Pump 2 (solo su L102 e L122)
5
Upper spray tube
17
Level probe
6
Gas shock bsorber
18
pump suction
7
Safety interlock
19
tank drain
8
Elettric pannel
20
tank bottom
9
Tank
21
Heating
10
Drain valve
22
Temperature probe
11
Probe accomodation
23
Safety temperature probe
12
Heating junction box
13
16
3
4
5
6
7
8
15
1
2
14
9
20
18
17
21
18
22
23
19
3
13
12
11
10
10