1: 

Removing old vanity (if applicable): 1) Turn off the water supply and drain out. 2) Disconnect the supply lines from the faucet. 3) Remove 

the old vanity top and vanity. If the new vanity is not installed immediately, temporarily stuff a rag into the drain pipes.

2: 

Using a level, locate any uneven floor and/or wall areas where your vanity will be installed. Unevenness can cause your vanity to become 

misaligned resulting in twisting of the cabinet. Repair any uneven areas by reducing high spots or shimming low spots. 

3:

 Attach each foot (x 4) by inserting and rotating its threaded dowel into the holes in the bottom of the vanity base. Figure 1.

4: 

1) Place the vanity in the desired position taking into account the location of your plumbing. 2) Ensure the vanity is level front to back and 

at both sides. 

5: 

Secure the vanity to the wall by inserting (x 2) #8 x 2” screws (B - not included) through the back rail of the vanity. Figure 2. It is 

recommended that the vanity be installed to at least one wall stud. If you are unable to locate wall studs, it is recommended that you use 

wall anchors (C - not included) to secure the vanity.

6: 

Attach the (x 2) handles by using (x 4) 1” screws. Figure 3.

7:

 Place the porcelain sink centered in the opening of the vanity base. Figure 4. 

For additional stability, clear 

silicone (D - not included) 

may be used to secure the 

porcelain sink onto the 

vanity base. 

NOTE:

 install 

the faucet (not included) 

as per the instruction 

sheet provided with the 

faucet to the vanity top 

before

 installing and 

sealing the vanity 

top onto the cabinet.

Questions? 

Call our customer service department at 1-855-995-5578, 8:30 a.m. - 5 p.m., EST, Monday - Friday

or e-mail: [email protected].

Tools required for assembly

(not included):

 

• tape measure

• electric drill with #2 drill bit (A)

• level

• (x 2) #8 x 2” screws (B)

• (x 2) wall anchors - if the vanity will

not be screwed to wall studs (C)

• silicone (D)

Estimated installation time: 

5 hours 

(includes drying time for 

silicone adhesive and removal of 

old vanity (if applicable))

PREPARATION

WARNINGS & CAUTIONS

WARNING:

 

Two people are required for safe installation. Take extra precautionary 

measures to ensure a secure grip on the vanity base, sink and top 

when lifting.

CAUTION: 

• The bathroom floor and wall must be finished prior to installation

  of the base, sink and top. 

• Do not use water that exceeds temperatures of 140°F/46°C.

• Do not place any sharp or abrasive objects on the bare surface of

the vanity top.

INSTALLATION

PACKAGE CONTENTS

OVERALL DIMENSIONS (WITH BACK SPLASH):

 

31” W x 38” H x 19” D

78.74 cm W x 96.52 cm H x 48.26 cm D

Faucet and drain not included. 

CARE & MAINTENANCE

• To maintain the beauty of the furniture finish, avoid placing the

  vanity in direct sunlight.

• Avoid exposing the vanity to extreme temperatures by installing

  away from heat and air vents.

• Dust frequently with a clean, soft and dry cloth.

• Wipe away any water or liquid spills on the vanity immediately

with a clean, soft and dry cloth.

• Clean the vanity top and sink only with non-abrasive cleaners or

mild detergents - do not use powder cleansers. For extremely

stubborn stains, use a small amount of acetone on a cloth and

gently rub out the stain.

Base (x 1)

Sink (x 1)

1” screws (x 4)

Handles (x 2)

ARCADIAN VANITY 

MODEL 48601 • INSTALLATION INSTRUCTIONS

Feet (x 4)

Top (x 1)

Back 

splash (x 1)

Figure 1

Figure 2

A

A

B

WITH TOP