
MAGICFX
®
STAGE SHOT II, STADIUM SHOT II & X-TREME SHOT
—
User and Installation Manual
23
3.3
RUN A TEST
1
Make sure that the pressure level is zero by checking the tank pressure meter. If
necessary depressurize the system by opening the ventilation valve.
2
Switch the power on and check if:
1. the LED power indicator lights up;
2. you hear a click sound.
3
If desired run a test with pressure. Follow the steps from Section 3.5 and 3.6.
3.4
FILL WITH CONFETTI AND/OR STREAMERS
1
Make sure that the machine is functioning correctly by running a test first, see
Section 3.3..
2
Make sure that the pressure level is zero by checking the tank pressure meter. If
necessary depressurize the system by opening the ventilation valve.
3
Place a lifting core in the bottom of the
output pipe.
Make sure the lifting core lies flat and
closes off the hole in the output pipe!
Summary of Contents for STADIUM SHOT II
Page 32: ...WWW MAGICFX EU...