
995051 – Revision A
Page 26 of 36
Refitting / Replacement
Step 4 - Refitting is a reversal of the removal process noting the following point:
A)
Ensure the Nuts are tight and secure the Carry Bar, do not over tighten as this will
bend the framework and will affect the pivoting function of the Carry Bar.
B)
Apply Loctite 243 to the thread of the Pin.
Step 6 – Inspect the Wear washer circled, replacement is necessary if thickness is measured to be
0.5mm or under.
9.8 – Leg Rod Assembly
Within this section it will explain the correct procedure on removing and reinstalling the Leg
Rod Assembly for servicing procedures or replacement.
Removal
Step 1 – Place the Hoist in its side for easier service – Gently rest the Hoist on its side to
avoid damage such as paint scratching. Circled is the Leg Rod Assembly.
Step 2 – Using a flat head screwdriver, unhook the Spring Clip from the ball point of the Leg
Rod Assembly as shown.