Safety
Version 1.0.2 dated 2018-09-12
Page 65
Translation of the original instructions
DH55G
GB
DH
55
G_
G
B
_
1.f
m
OPTIMUM
M A S C H I N E N - G E R M A N Y
®
1.9.1
Emergency stop button
ATTENTION!
The drilling spindle keeps turning for a short time even after actuating the emergency
stop push button depending on the preset speed.
1.9.2
Master switch
In the "0" position, the lockable main switch can be secured against accidental or non-author-
ised switching on by means of a padlock.
The power supply is cut off when the master switch is in the off position.
Except for the areas marked by the pictogram in the margin. In these areas there might be volt-
age, even if the main switch is switched-off.
WARNING!
Dangerous voltage even if the main switch is switched off.
The areas marked by the pictogram might contain live parts, even if the master switch is
switched off.
1.9.3
Drill chuck guard
Adjust the guard to the correct height before you start working.
To do so, slacken the clamping screw, set the required height and re-tighten the clamping
screw.
There is a switch integrated in the spindle protection mounting which monitors the closed posi-
tion.
INFORMATION
The machine cannot be started, if the drill chuck guard is not closed.
1.10
Safety check
Check the geared drill before each start-up or at least once per shift. Inform the person respon-
sible immediately of any damage, defects or changes in the operating function.
Check all safety devices
at the beginning of each shift (with the machine stopped),
once a week (with the machine in operation) and
after all maintenance and repair work.
Check that prohibition, warning and information signs and the labels on the geared drill
are legible (clean them, if necessary)
are complete (replace if necessary).
INFORMATION
Organise the checks according to the following table;
General check
Equipment
Check
OK
Guards
Mounted, firmly bolted and not damaged
Signs,
Markers
Installed and legible
Date:
Checked by (signature):