215028
13
Revision A
3.3
Unpacking Hydraulic Hoses and Electrical Harness
–
M1240
Follow these steps to unpack the hydraulic hoses and electrical harness.
1028196
A
B
C
Figure 3.7: Hydraulic Hose Bundle in Shipping Position
1.
Remove shipping wire securing hose ends (A) to secured
hoses (B) and remove all packing foam from the hose ends.
2.
Remove packing foam from hose support (C).
NOTE:
Packing foam not shown in illustration at right.
1028227
A
B
C
D
E
Figure 3.8: Hydraulic Hose Bundle in Shipping Position
3.
Remove shipping wire cross ties (A) securing hoses (B) to
center-link (C) near shipping stands (D), and pull the hoses
out from under the center-link.
NOTE:
Shipping wire cross ties not shown in illustration at right.
4.
Remove shipping wire (E) from center-link (C) and move
hoses (B) away from the center-link. Rest hoses (B) on top
of the header.
1028228
A
B
Figure 3.9: Center-Link
5.
Remove shipping wire and remove coiled electrical
harness (A) from the center-link (B). Place the harness in a
safe and clean spot until it
’
s time to install on the
windrower.