Figure 3.88: Control Valve
7.
Retrieve completion valve assembly (A) and one M12 x 25
flanged hex head bolt from the shipping bag.
8.
Remove bolts (B) from the standoffs on the rear of the
carrier. Install valve assembly (A) behind support plate (C).
Secure it to the standoffs using three M12 x 25 flanged hex
head bolts (B).
$
%
&
Figure 3.89: Control Valve
9.
Retrieve paddle assembly (B) from the shipping bag.
10. Install washers (A) onto the bolts welded to the completion
valve assembly.
11. Install paddle assembly (B) onto the welded bolts and
secure with nuts (C).
NOTE:
Make sure that paddle (B) is centered on the valve and
moves freely.
Installing Hydraulics
This section explains how to install the transport hydraulic control system.
Installing Hydraulic Lines and Hoses
Hydraulic hoses and lines distribute hydraulic fluid to the various components on the pull-type.
NOTE:
The cover support bracket has been removed from the illustrations for clarity.
NOTE:
Refer to
10.4 Torque Specifications, page 184
for torque details.