
Introduction
The DEF Head Service kit (MD #183997) is for 2018 and prior M155
E4
Self-Propelled Windrowers that require DEF head
replacement.
This document explains how to install the kit. A list of parts included in the kit is provided in Chapter
.
NOTE:
A complete list of serviceable parts is included in
. Please provide these pages to the end user
to ensure they have the correct list of serviceable parts for this DEF head and tank.
Installation time
The approximate installation time for this kit is 2 hours.
Conventions
The following conventions are used in this document:
•
Right and left are determined from the operator
’
s position, facing forward with the windrower in cab-forward position.
•
Unless otherwise noted, use the standard torque values provided in the windrower operator
’
s manual and technical
manual.
NOTE:
Keep your MacDon publications up-to-date. The most current version of this instruction can be downloaded from our
Dealer-only site (
) (login required).
NOTE:
This document is currently available in English only.
215233
i
Revision B