
Introduction
This instruction manual describes the unloading, setup, and predelivery requirements for the MacDon M155 Self-Propelled
Windrowers shipped in containers.
Carefully read all the material provided before attempting to unload, assemble, or use the machine.
Retain this instruction for future reference.
Conventions
The following conventions are used in this document: Right and left are determined from the operator
’
s position. The front
of the windrower is the side that faces the crop.
NOTE:
Keep your MacDon publications up-to-date. The most current version can be downloaded from our Dealer-only site
(
) (login required).
This instruction is available in English and Russian and can be downloaded from our Dealer-only site.
215015
i
Revision A