
214327
41
Revision B
3.3
Break-In Period
Until you become familiar with the sound and feel of your new header, be extra attentive.
CAUTION
Before investigating an unusual sound or attempting to correct a problem, shut off engine and remove key.
After attaching the header to the windrower for the first time, follow these steps:
1.
Operate the machine with the reels, drapers, and knives running slowly for five minutes. Watch and listen
FROM THE
OPERATOR
’
S SEAT
for binding or interfering parts.
NOTE:
Reels and side drapers will not operate until oil flow fills the lines.
2.
Refer to
5.3.2 Break-In Inspection, page 123
and perform all the specified tasks.
Summary of Contents for D65
Page 3: ...Declaration of Conformity 1022881 214327 i Revision B ...
Page 4: ...1022882 214327 ii Revision B ...
Page 12: ......
Page 20: ......
Page 42: ......
Page 50: ......
Page 115: ...214327 95 Revision B 1001652 A B C Figure 3 83 Beater Bars OPERATION ...
Page 138: ......
Page 262: ......
Page 276: ......
Page 308: ......