
1. Position the
fi
nger on the rear of the
fi
nger tube and
engage the lug at the bottom of the
fi
nger in the lower
hole in the
fi
nger tube.
2. Lift the top
fl
ange gently and rotate the
fi
nger until the
lug in the top of the
fi
nger engages the upper hole in
the
fi
nger tube.
Figure 5.167: Installing Finger
IMPORTANT:
Do
NOT
apply force to the
fi
nger prior to tightening
the mounting screw. Applying force without tightening
the mounting screw will break the
fi
nger or shear the
locating pins.
3. Install the screw (A) using a Torx
®
Plus 27 IP socket
wrench and torque to 8.5–9.0 N·m (75–80 in·lbf).
Figure 5.168: Installing Finger
5.8.5
Tine Tube Bushings
Removing Bushings from Five-, Six-, or Nine-Bat Reels
WARNING
To avoid bodily injury or death from unexpected startup of machine, always stop engine and remove key
before making adjustments to machine.
WARNING
To avoid bodily injury from fall of raised reel, always engage reel safety props before going under raised
reel for any reason.
IMPORTANT:
Ensure the tine tube is supported at all times to prevent damage to the tube and other components.
1. Lower the header, raise the reel, and engage the reel safety props.
2. Shut down the engine, and remove the key from the ignition.
NOTE:
If replacing only the cam end bushing, refer to Step
214044
182
Revision A