![MacDon D115X Operator'S Manual Download Page 247](http://html.mh-extra.com/html/macdon/d115x/d115x_operators-manual_685662247.webp)
215651
233
Revision B
Installing Double-Reel U-Joint
$
%
&
Figure 5.240: U-Joint
1.
Position U-joint flange (B) onto driven sprocket (C)
as shown.
2.
Apply medium-strength threadlocker (Loctite® 243 or
equivalent), and install six bolts (A). Hand-tighten the bolts;
do
NOT
torque the bolts.
NOTE:
Only four bolts (A) are shown in the illustration at right.
NOTE:
It may be necessary to move the right reel sideways so that
the U-joint can clear the reel tube.
$
%
Figure 5.241: U-Joint
3.
Position the right reel tube against the reel drive and
engage the stub shaft into the U-joint pilot hole.
4.
Rotate the reel until the holes in the end of the reel tube
and U-joint flange (B) line up.
5.
Apply medium-strength threadlocker (Loctite
®
243 or
equivalent) to four 1/2 in. bolts (A) and secure in the
flange.
6.
Torque the ten bolts to 108 Nm (80 lbf
∙
ft).
$
Figure 5.242: Supporting Reel
7.
Remove sling (A) from the reel.
8.
Install the drive cover. For instructions, refer to
.