background image

[email protected]

5

00_Avvertenze-02 200221

GBR

WARNINGS FOR THE MAINTENANCE TECHNICIAN 

•  The installation must be carried out by competent companies and experts in the fi eld.
•  The maintenance technician must be formed and informed about bollard installation.
•  The maintenance technician must work using the specifi c protection devices and following the safety regulations 

in force in the place where the bollard is installed.

•  To not cause damages, the maintenance technician must evaluate carefully the place where the bollard will be 

installed and check that all the moving parts are free from obstacles, by also checking that the handlings operate 
linearly.

•  For what concerns the movement operations, make reference to the “Transport and lifting” chapter.
•  MAC s.r.l.   is not responsible about the non-compliance of its products and accessories installation methods.
•   The maintenance technician must insert the protections against the indirect contacts upstream of the power line, 

following the regulations in force according to the installation place. 

•  Check that upstream of the plant there is a diff erential magnetermic switch with a 0,03 A threshold.
•  The control unit main power line must be directly connected upstream of the specifi c main switch, placed inside 

the station itself. 

•  Use standard fl ameproof cables.
•  To guarantee a correct power source (230V +/- 10% in movement); the main power line sizing must be at least 

3x2,5 mm. Anyway, it must be meditated by the maintenance technician depending on the main switch sizing and 
on the distance from the distribution point. 

•  Check the grounding system is perfectly done.
•  The maintenance technician must give to the client/user all the information about the bollard manual handling in 

case of emergency and give the user and maintenance manual.

Summary of Contents for C275G

Page 1: ...00_FS 00 200221 C275G C200G C140G MANUAL GBR CAREFULLY READ THE MANUAL BEFORE USE Customer Timbre Signature Installing Company Timbre Signature ...

Page 2: ...IMENSIONS 3 WARNING 4 SHIPPING 4 WASTE DISPOSAL 4 TRANSPORT AND LIFTING 4 D P I FOR THE OPERATOR 4 WARNINGS FOR THE MAINTENANCE TECHNICIAN 5 PREPARATION OF THE EXCAVATION 6 BOLLARD LAYING PROCEDURE 7 OPERATION OF ASCENT AND DESCENT 10 GBR SUMMARY ...

Page 3: ...info mac srl it 3 00_FS 00 200221 B D C A C275G A B C D 275 500 481 731 700 931 800 1031 C200G A B C D 200 500 330 735 700 935 800 1035 C140G A B C D 140 500 276 735 700 935 800 1035 GBR DIMENSIONS ...

Page 4: ...s are accurately checked and tested by the manufacturer before the shipping At the moment of delivery check if the bollard has been damaged during the transport Moreover check that nothing has been rigged or removed In case of noticing damages or missing parts warn the courier and the manufacturer sending them related photo documentation WASTE DISPOSAL MAC s r l recommends to respect the environme...

Page 5: ...he non compliance of its products and accessories installation methods The maintenance technician must insert the protections against the indirect contacts upstream of the power line following the regulations in force according to the installation place Check that upstream of the plant there is a differential magnetermic switch with a 0 03 A threshold The control unit main power line must be direct...

Page 6: ...en thought for land with poor draining qualities where digging water is immediately found and or where there is not the possibility to carry everything in a sewer system The bollard will be collocated in a waterproof concrete tank so if the water level raises the bollard remain isolated from the surrounding land This drawing shows how to install a well for the discharge of the excessive water from...

Page 7: ... a well equipped by an emptying system with a greater depth Insert gravel with grain 22 32 mm diameter and 220m height In order to avoid retreats of settling it is advisable to compact the gravel Insert a geotextile layer gr 300 on the compacted gravel Put the PVC pipe diameter of 100 mm and length 200mm in the middle of the dig on the geotextile the PVC pipe is necessary for the passage of the ra...

Page 8: ...in the view from the above N B Position the bollard so as to protrude 20mm from the floor level in order to limit the enter of rainwater in the little well Gradually insert the concrete verifying that the hole is filled uniformly Deal the concrete so as to not to leave empty pockets of air especially below the bollard 1 Screw off the 4 four bolts using the Allen key 2 Extract the trampling platform 3...

Page 9: ...191203 9 u m m 0 00 0 00 0 02 P 02 0 02 P 02 u m m 0 00 0 00 0 02 GBR N B Make the connection N B Remove the protections of polystyrene from the runner Make sure that the concrete is solidified before to insert the extractable structure ...

Page 10: ...rn the key counterclockwise until the stop be careful in the opening mechanism there is a gas spring the bollard goes up Descent of the bollard open the cover on the head of the bollard insert the key supplied push the head of the bollard and at the same time turn the key counterclockwise until the stop be careful in the opening mechanism there is a gas spring lower the bollard by pushing it down ...

Page 11: ...info mac srl it 11 02_IN Palmo_00 191203 GBR ...

Page 12: ...www mac srl it 12 02_IN Palmo_00 191203 GBR ...

Reviews: