6.  Now add the driven element outer half element assembly completed in previous steps to the 1-1/2" 
sections using 8-32 x 1-3/4" screws and locknuts.  Repeat for the other element half. 
 
 
7

.  LINEAR LOADING ROD INSTALLATION (FOR BOTH ELEMENT HALVES) 

Place each element assembly on a level surface with the support post up. FROM THE ELEMENT 
BUTT SIDE, feed a 3/16” diameter LINEAR LOADING ROD through the flat support insulator.  
Then insert the rod into the LL ARM. The rod should protrude just 1/2” through each arm.  Tighten the 
8-32 x 1/4" set screw and repeat for the other rod. Install a SHAFT RETAINERs, on these rod tips and 
snug up against the LL arms.  Repeat for the other element half.  Repeat this step for  each element. 
 
NOTE: to start the RETAINER, hold the 3/8 x 3" PUSH TUBE in your hand with one end between your 
thumb and forefinger. Now center the retainer on this end, “dish” into tube, and hold in place with the 
same thumb and forefinger. Grasp the linear loading rod near the end with your other hand and firmly 
push the retainer onto the rod. 
 8.  SHORTING BAR PREPARATION 
Locate the 16 shorting bar halves.  Assemble the shorting bars with 8-32 x 1” screws and locknuts.  
Finger tighten the locknuts for now.  Next, begin to assemble the phyllistrand tension lines as shown 
on the ELEMENT HARDWARE drawing.  On each shorting bar, insert one end of each length of 
PHILLISTRAN HPTG-1200 CORD into the CENTER hole of the shorting bar. Loop the cord AROUND 
THE STRAIN RELIEF back through the other hole and allow about 2” to pertrude. Place a cable clip 
here as a “backup” to the final clamping action of the shorting bar halves. Don’t tighten the hardware at 
this time.  
(OPTIONAL)> On each phyllistrand tension line insert two more 1/8” cable clips and allow them to 
slide all the way to the shorting bar for now.    
 

 

9. SHORTING BAR INSTALLATION 
Next, feed each shorting bar onto the pair of linear rod ends and position about them at the 
measurement as shown on the DIMENSION SHEET.  NOTE the dimension is measured from the 
OUTSIDE edge of the LL arm to the OUTSIDE edge of the shorting bar. (USING A BLACK 
PERMANENT MARKING PEN OR EQUIVALENT, MARK THE SPOT ON THE ROD WHERE THE 
SHORTING BAR SHOULD BE)  Be sure the linear loading lines are centered about the main element.  
Once the shorting bars have been correctly set, align, and tighten all of the 8-32 hardware.  Cut off the 
excess material (if any) so that about 1” of rod extends beyond the shorting bar. Start a SHAFT 
RETAINER onto each rod end (just to backup the clamping function).  Push the retainers up against 
the shorting bar.  Repeat for all of the other element halves.   
 
10.  SUSPENSION OF PHYLLISTRAN TENSION LINES 
At this point you might want to perform the remaining steps on a flat surface. Support the ends of each 
element tip up so that it is at the same height as the center section.  Next insert the phyllistrand 
tension lines through their respective turnbuckles, around each thimble or cable eye, and then finally 
back through the two cable clips.  See the ELEMENT HARDWARE drawing for an illustration.  Now 
pull on the free end of the phyllistrand until the entire element appears to be level.  (IT MAY BE 
HELPFUL TO RAISE THE OUTER END OF THE ELEMENT HALF WITH A 4” BLOCK OF WOOD OR 
BRICK. At this point, secure the tension line by tightening the two 1/8” cable clips.  Repeat this 
procedure for all the other element halves.  The final tensioning of the linear loading rods is done with 
the TURNBUCKLES. This can be performed after the elements have been secured to the boom.   
 

 

11.  BOOM ASSEMBLY  
Use the BOOM HARDWARE drawing as a guide to assemble the boom.  At this point it will be helpful 
to perform the remaining assembly steps with the antenna elevated off the ground (about 3 feet).  This 
can be accomplished by using sawhorses or something similar.  Wipe off the swaged ends of each 
boom section and apply a small amount of Penetrox.  Insert the swaged end of the boom sections into 
the straight piece.  Align all of the holes, install the 1/4-20 x 3-1/2" bolts and locknuts, and tighten.  
Install the 5/16 x 5” eyebolts near each end of the boom. 

40M3L ASSEMBLY MANUAL 

Summary of Contents for 40M3L

Page 1: ...nding performance that will deliver years of enjoyment on the 40 meter band Mechanically the elements are mounted between 1 2 thick machined aluminum clamp plates The Driven element is split and insul...

Page 2: ...G ROD into a CLAMP PLATE ASSEMBLY Center the assembly and align the bolt holes to vertical Tighten all four outer element clamp plate bolts EVENLY Make sure plates remain parallel top to bottom 2 VERT...

Page 3: ...sections into the swaged 1 sections and secure with 8 32 x 1 1 4 screws and locknuts NOW IS THE TIME TO DETERMINE WHAT PART OF THE BAND YOU WANT TO USE MOST AND EMPHASISE THE 3 BAND SEGMENTS INSURE V...

Page 4: ...MENSION SHEET NOTE the dimension is measured from the OUTSIDE edge of the LL arm to the OUTSIDE edge of the shorting bar USING A BLACK PERMANENT MARKING PEN OR EQUIVALENT MARK THE SPOT ON THE ROD WHER...

Page 5: ...n tubes INSERT the tubes into the grooved channels of 3 8 clamp block assemblies on Driven element Push the tubes through until at least 1 4 extends beyond clamp and then tighten the clamp bolt slight...

Page 6: ...roops again following final adjustments check your knots They may be may be slipping D After final installation of the antenna the turnbuckle plate installed loosely with a 2 U bolt is raised up the m...

Page 7: ...2 1 7 0 7 130 7 1 7 240 7 150 7 30 REFLECTOR 58 50 50 50 47 50 DRIVEN 44 50 37 50 34 50 DIRECTOR 39 50 31 50 28 50 S HAIRPIN SHORT 36 36 36 108 5 108 5 108 5 ON ALL EIGHT HALF ELEMENT SECTIONS 1 X 1...

Page 8: ...POST 1 4 20 X 2 BOLT LOCKNUT DRIVEN ELEMENT HARDWARE 8 32 X 1 SCREW LOCKNUT 5 PER SIDE 1 1 4 X 24 FIBERGLASS ROD 1 3 8 X 23 13 16 SLEEVE 1 1 2 X 60 SOE 1 4 20 X 2 3 4 BOLT LOCKWASHER STRAIN RELIEF HPT...

Page 9: ...8 CLAMP BLOCKS HAIRPIN TUBE 3 8 ALUM TUBE 2 1 1 BALUN AREA TOP VIEW HAIRPIN SHORTING BAR DETAIL END VIEW 3 8 X 1 SPACER 1 4 20 X 2 BOLT LOCKNUT BAND CLAMP 52 1 20 X 1 4 SET SCREW LINEAR LOADING HARDWA...

Page 10: ...GENERIC COMPRESSION CLAMP DETAIL NOTE Generic layout to show how compression clamps work Your antenna may have one or the other or may even have both compression clamp sizes...

Page 11: ...Element section 3 4 x 049 x 48 SOE 6 Element tip section 1 2 x 049 x 61 50 2 Element tip section 1 2 x 049 x 47 50 2 Element tip section 1 2 x 049 x 42 50 2 Hair pin tube 3 8 x 55 2 ALUMINUM ROD DESC...

Page 12: ...stainless 14 Bolt 1 4 20 x 2 0 stainless 5 Set screws 1 4 20 x 1 4 ss 2 Nut 1 4 20 stainless 6 Nut 1 4 20 locking stainless 27 Allen wrench 1 8 1 BAG 9 5 8 Compression clamp 6 Screw 8 32 x 1 3 4 panhe...

Reviews: