BEFORE USE
Thank you for choosing M-System. Before use, please check
contents of the package you received as outlined below.
If you have any problems or questions with the product,
please contact M-System’s Sales Office or representatives.
■
PACKAGE INCLUDES:
Signal conditioner (body + base socket) .............................(1)
Screw (M4 × 20)...................................................................(2)
The Mounting Block air header is required.
Model MB-01
Single mounting
Model MB-08
8-unit clustered mounting
Model MB-16
16-unit clustered mounting
■
MODEL NO.
Confirm Model No. marking on the product to be exactly
what you ordered.
■
INSTRUCTION MANUAL
This manual describes necessary points of caution when
you use this product, including installation, connection and
basic maintenance procedures.
POINTS OF CAUTION
■
GENERAL PRECAUTIONS
• Before you remove the unit from its base socket or mount
it, turn off the input signal for safety.
■
ENVIRONMENT
• Indoor use.
• When heavy dust or metal particles are present in the
air, install the unit inside proper housing with sufficient
ventilation.
• Do not install the unit where it is subjected to continuous
vibration. Do not subject the unit to physical impact.
• Environmental temperature must be within -5 to +55°C
(23 to 131°F) with relative humidity within 30 to 90% RH
in order to ensure adequate life span and operation.
■
WIRING
• Do not install cables close to noise sources (relay drive
cable, high frequency line, etc.).
• Do not bind these cables together with those in which
noises are present. Do not install them in the same duct.
■
AND ....
• The unit is designed to function as soon as the input sig-
nal is supplied, however, a warm up for 10 minutes is re-
quired for satisfying complete performance described in
the data sheet.
• DO NOT apply the input signal when there is no supply
pressure.
• The transducer produces no output when the input goes
below approximately 3.5mA.
COMPONENT IDENTIFICATION
Base Socket
Body
H
•
UNIT
Connection
Diagram
(side)
Specifications
Zero Adj.
Span Adj.
Mounting Block
INSTALLATION
■
RACK MOUNTING
Install the Mounting Block (model: MB) on the Standard
Rack Mounting Frame (model: BX-16H).
■
MOUNTING HVPN ON MB-08 OR MB-16
First, install the Mounting Block (MB-08 or MB-16) with
the attached 4 screws (M5 × 40) and remove the closing
panels for required number of HVPN.
Then, loosen 2 screws binding the HVPN unit and its base
socket, separate them and mount the base socket on the MB
with the attached M4 × 20 screws. Be sure to insert the
gasket between them.
Plug-in the HVPN unit to the base socket and re-tighten it.
Note 1: Remove the closing panels at the last moment before
mounting the base socket, in order to eliminate any
dust entering into the MB.
Note 2: For adding a base socket to a MB which is already
operating, stop the air supply.
■
MOUNTING HVPN ON MB-01
Remove the closing panel. Then separate the HVPN unit
and its base socket and mount the base socket on the MB
with the attached 2 screws (M4 × 20). Be sure to insert the
gasket between them. Install the assembly of the Mounting
Block and the base socket with the attached 2 screws (M4
× 60).
• Refer to the instruction manual for model MB when
mounting the transducer to the Mounting Block.
5-2-55, Minamitsumori, Nishinari-ku, Osaka 557-0063 JAPAN
Phone: +81(6)6659-8201 Fax: +81(6)6659-8510 E-mail: [email protected]
EM-3440 Rev.9 P. 1 / 3
INSTRUCTION MANUAL
LOOP POWERED I/P TRANSDUCER
MODEL
HVPN