background image

P. 1 / 3

EM-0492-K5

5-2-55, Minamitsumori, Nishinari-ku, Osaka 557-0063 JAPAN

Phone: +81(6)6659-8201   Fax: +81(6)6659-8510   E-mail: [email protected]

18KBXC-K5

BEFORE USE ....

Thank you for choosing M-System.  Before use, check the 
contents of the package you received as outlined below.
If you have any problems or questions with the product, 
please contact M-System's Sales Office or representatives.

PACKAGE INCLUDES:

  Standard rack ...........................................................(1)

MODEL NO.

Confirm that the model number described on the product is 
exactly what you ordered.

INSTRUCTION MANUAL

This manual describes necessary points of caution when you 
use this product, installation, connection and basic mainte-
nance procedures.

POINTS OF CAUTION

POWER INPUT RATING & OPERATIONAL RANGE

24 V DC ±10%, 2.5 A minimum
                        

ENVIRONMENT

• When  heavy  dust  or  metal  particles  are  present  in  the 

air, install the unit inside proper housing with sufficient 
ventilation.

• Do not install the unit where it is subjected to continuous 

vibration.  Do not apply physical impact to the unit.

• Environmental temperature must be within -5 to +55°C 
(23 to 131°F) with relative humidity within 30 to 90% RH in 

order to ensure adequate life span and operation.

•  Be  sure  that  the  ventilation  slits  are  not  covered  with 

cables, etc.

WIRING

• Do not install cables (power supply, input and output) close 

to noise sources (relay drive cable, high frequency line, etc.).

• Do not bind these cables together with those in which noises 

are present.  Do not install them in the same duct.

AND ....

• The unit is designed to function as soon as power is supplied, 

however, a warm up for 10 minutes is required for satisfying 
complete performance described in the data sheet.

COMPONENT IDENTIFICATION

Specifications

Side

Body

MOUNTING REQUIREMENTS

  mm (inch)

101.6   (4.00)

*

450 (17.72)

465 (18.31)

4–M5 SCREW

ANGLE BRACKET

Observe an appropriate wiring space over and below.

*

100 (3.94) for JIS standard

CHECKING

1)  Terminal wiring:  Check that all cables are correctly con-

nected according to the connection diagram.

2) Power input voltage:  Check voltage across terminals 1 

(+) – 2 (–).  Use a power source of ripple level 10% p-p or 

less.

3)  Installation  & environment:  Check ambient temperature. 

Also check that there are no excessive dust particles around. 
Check that there is no vibration.

STANDARD RACK

(Yamatake DCS PI connector)

MODEL

18KBXC-K5

INSTRUCTION MANUAL

Reviews: