background image

For 2.5mm cable, 

remove the insert in 

the centre, place the 

cable into the channel 

and push it down so 

itʼs completely flat.

For 1.5mm cable 

place the cable¹ into 

the channel and 

push it down so itʼs 

completely flat.

OPTIONAL

INSTALLATION GUIDE

Turn over for termination and unlocking guide

¹NOTE: for polarity, ensure the 

Active/Line conductor is aligned 

with the red mark. This can be 

achieved by nicking a small part 

of the insulation off the cable 

outer sheath.

N E L

TPS 2C+E

flat cable

Place the cover on top 

of the main body and 

press the pins firmly 

into the guides.

Reviews: