For 2.5mm cable,
remove the insert in
the centre, place the
cable into the channel
and push it down so
itʼs completely flat.
For 1.5mm cable
place the cable¹ into
the channel and
push it down so itʼs
completely flat.
OPTIONAL
INSTALLATION GUIDE
Turn over for termination and unlocking guide
¹NOTE: for polarity, ensure the
Active/Line conductor is aligned
with the red mark. This can be
achieved by nicking a small part
of the insulation off the cable
outer sheath.
N E L
TPS 2C+E
flat cable
Place the cover on top
of the main body and
press the pins firmly
into the guides.