background image

DESCRIPTION:
Type 131
BOOM 

2.5 hrs

FLOOR AREA                     CEILING HEIGHT
2,5M X 2,5M                          2,0M

REQUIRED ASSEMBLY SPACE

REQUIRED ASSEMBLY TOOLS

2 PERSON ASSEMBLY

APPROXIMATE ASSEMBLY TIME
EXCLUDING GLUE SETTING TIME

f

8 m m

1/17

ASSEMBLY

INSTRUCTION

ASSEMBLED DIMENSIONS

MEASURE

338 mm

888 mm

2099 mm

PACK 1

 

CONSISTS OF PARTS :

4, 5, 6, 7, 8, 13,  22, 24,
Fittings

PACK 2

 

CONSISTS OF PARTS :

1, 2, 3, 9, 10, 21, 25.

Summary of Contents for BOOM 131

Page 1: ...ASSEMBLY SPACE REQUIRED ASSEMBLY TOOLS 2 PERSON ASSEMBLY APPROXIMATE ASSEMBLY TIME EXCLUDING GLUE SETTING TIME f 8mm 1 17 ASSEMBLY INSTRUCTION ASSEMBLED DIMENSIONS MEASURE 338 mm 888 mm 2099 mm PACK 1 CONSISTS OF PARTS 4 5 6 7 8 13 22 24 Fittings PACK 2 CONSISTS OF PARTS 1 2 3 9 10 21 25 ...

Page 2: ...EFT SHELF 8 BOTTOM PANEL 13 RIGHT SHELF 4 TOP PANEL 6 LEFT HORIZONTAL DIVIDER 7 SHELF GLASS 9 LEFT BACK PANEL 10 RIGHT BACK PANEL 21 LEFT PLINTH NO PARTS LIST 22 PLINTH 24 LEFT DOOR 25 RIGHT DOOR W GLASS QTY 1 1 1 1 2 1 2 1 1 1 2 1 QTY 1 2 1 4 22 7 7 3 9 10 8 6 5 1 24 25 5 13 21 24 2 13 ...

Page 3: ...0 mm 28x CAM COVER D 16x SECURING BRACKET E 11x 3x20mm SCREW F 4x 3 5x30mm SCREW F2 30x 3 5x13mm SCREW M 3 17 3x 4x16mm SCREW F3 1x O HANDLE 16x 6 3x13mm GRUB SCREW L1 6x PEG H 3x SLEEVE GLASS I 5x NYLON FOOT L 8x METAL PLATE N 10x 4x40mm SCREW S 3x SQUARE P 2x O1 HANDLE 4x COVER f5 K 2x SCREW COVER D ...

Page 4: ...m HARDWARE LIST 4 17 LEVEL QUOIN X 2x HINGE PLATE H 2 4x V 4x HINGE W kr0 4x HINGE W1 1x METAL PLATE Q 8x 5x16mm SHELF SUPPORT Z 8x 5x16mm SHELF GLASS SUPPORT Z1 1x 4x35mm PLASTIC DOWEL R 2x 3 5x13mm 1x ANGLE T 90 HINGE PLATE H 2 4x V ...

Page 5: ...are assembled near to the area in which they will be placed in use to avoid moving the product unnecessarily once assembled 5 For the protection of your furniture particularly items of high gloss finish we recommend that the product is placed on a protected surface during assembly to prevent any damage 6 During assembly please take care not to over tighten any fittings as this may damage the produ...

Page 6: ...STARTING POSITION IS CORRECT BEFORE YOU INSERT CONNECTING CAM PILLAR TURN CLOCKWISE UNTILE SECURE CAM PILLAR NO GAP Panel Panel Shoulder Tighten until shoulder is flush with panel Do not overtighen or undertighten see example below Pillar head needs to be in centre Align with long point of cross 6 17 ...

Page 7: ...12x CAM BOLT A 12x 15x12mm CAM LOCK B STEP 1 7 17 180 8 2x 1 0 m m 10 mm L S 8 8 B A 5x NYLON FOOT L 10x 4x40mm SCREW S 4 6 13 136mm 136mm 336mm ...

Page 8: ...STEP 2 8 17 4x CAM BOLT B 8x 6 3x13mm GRUB SCREW L1 HINGE PLATE H 2 4x V B 3 5x13 V L1 22 P M 50 50 394 394 3x SQUARE P 6x 3 5x13mm SCREW M 21 22 21 ...

Page 9: ...STEP 3 9 17 B A 2x W M 23mm 90 W1 M 16mm Kr0 1 ca 10mm 2 3 kr0 4x HINGE W1 4x HINGE W 90 16x 3 5x13mm SCREW M 24 25 ...

Page 10: ...STEP 4 10 17 970mm 180 V L1 A C A B A 16x 15x12mm CAM LOCK 12x CAM BOLT B 12x 8x28mm DOWEL C HINGE PLATE H 2 4x V 8x 6 3x13mm GRUB SCREW L1 2 1 3 3 2 ...

Page 11: ...STEP 5 11 17 A A B C 1 2 TURN CLOCKWISE 1 6 3 13 2 13 9 10 2 1 4 752 5 ...

Page 12: ...STEP 6 12 17 4 14 1 2 TURN CLOCKWISE B A A B C A 8 4 2 2 3 8 1 3 1 ...

Page 13: ...STEP 7 13 17 A B 1 3 5x13 B B P M 6x 3 5x13mm SCREW M 2 3 4 22 1 21 8 2 22 4 4 22 1 21 ...

Page 14: ...STEP 8 14 17 985mm F N 3 4 E o 90 1 2 F 3x20mm 16x SECURING BRACKET E 11x 3x20mm SCREW F 8x METAL PLATE N 8 2 10 9 1 4 8 2 10 9 1 4 a b a b ...

Page 15: ...STEP 9 15 17 7 Q M 9 Top panel use drill f8mm 1 2 3 4 R T T X 1x METAL PLATE Q 2x 3 5x13mm SCREW M 1x 4x35mm PLASTIC DOWEL R 2x 3 5x13mm 1x ANGLE T LEVEL QUOIN X 2x 2 25 24 24 1 3 25 24 21 22 21 ...

Page 16: ...I O LED Lights in type 317 28x CAM COVER D 8x 5x16mm SHELF SUPPORT Z 8x 5x16mm SHELF GLASS SUPPORT Z1 1x O 1 2 HANDLE 2x O1 1 2 HANDLE 4x COVER f5 K 3x 4x16mm SCREW F3 4x 3 5x30mm SCREW F2 3x SLEEVE GLASS I 6x PEG H 2 3 1 5 7 24 24 24 25 f 5 24 3 13 L13 2x ...

Page 17: ...STEP 11 17 17 ...

Reviews: