Luxair LA 90 BARI CM Installation Instruction Download Page 1

LA 90 BARI CM

Installation instruction

2014 Bari Luxair Cooker Hoods

Summary of Contents for LA 90 BARI CM

Page 1: ...LA 90 BARI CM Installation instruction 2014 Bari Luxair Cooker Hoods...

Page 2: ...manufacturer declines any responsibility for damages caused by incorrect mounting Please inspect the ceiling hood prior to installation for cosmetic damages please be assured that your new cooker hood...

Page 3: ...tro 650 Gas 120 150 120 150 120 150 please ensure that you use the minimum 5 ducting either flat channel or round 125mm see ducting section on our website never reduce this minimum requirement on any...

Page 4: ...M 3 1 2 3 4 5 6 7 8 M 4 pull and lift the front remove the screws fig 4 panel upwards we supply a paper template as below for fixing positions...

Page 5: ...using fixings that are suitable for your ceiling type please note we only supply standard fixings please ensure you make good all fixings depending on your ceiling materials Now make sure you set you...

Page 6: ...M 8 M 7 13 14 15 16 Unscrew the service hatch to access the power and ducting connections...

Page 7: ...M 10 M 9 17 18 19 20 21 Now secure the service hatch Attach the outer frame to cover any rough edges...

Page 8: ...of use this is a warning that the filters need cleaning you can clean these by either placing them in your dishwasher or hot soapy water please ensure they are clean and dry before replacing them Your...

Page 9: ...od is switched off 2 press and hold the key on the remote fob and point it to your cooker hood 3 keeping the key help down now turn the power back on to your hood 4 you will hear a BEEP confirming tha...

Page 10: ...NOTES WARRANTY REGISTRATION http www luxairhoods com warranty registration luxair cooker hoods...

Reviews: