![Lütze LION Series Operating Instructions Manual Download Page 30](http://html1.mh-extra.com/html/lutze/lion-series/lion-series_operating-instructions-manual_1951222030.webp)
LION I/O Modules
▪
Installation
30
6.5
Grounding the Modules
Electric shocks and injuries because of wrong grounding.
▪ Do not ground the modules via top hat rail.
▪ Always ground the modules via the PE connection.
▪ It is also mandatory to ground the DIN rail for EMC reasons.
▪ The modules has to be grounded by an expert employee.
Mount a ring cable lug via bolt with Torx
mechanism.
1. Loose the bolt (3) of the PE clamp.
2. Take a ring cable lug (2).
3. Fix the ring cable lug between the
Schnorr washer (1) and the bolt (3).
4. Ground the module.
Fig. 23: Grounding