background image

Operating Instructions

LCOS Unmanaged Switch

4 ports / 8 ports

779200.0401, LCOS-SW-4P
779201.0401, LCOS-SW-4P
779200.0801, LCOS-SW-8P
779201.0801, LCOS-SW-8P

Version 01

2020-06-22

Summary of Contents for 779200.0401

Page 1: ...Operating Instructions LCOS Unmanaged Switch 4 ports 8 ports 779200 0401 LCOS SW 4P 779201 0401 LCOS SW 4P 779200 0801 LCOS SW 8P 779201 0801 LCOS SW 8P Version 01 2020 06 22...

Page 2: ...interest of technical development These changes are not necessarily documented in each individual case This manual and the information contained herein have been compiled with due care However the com...

Page 3: ...cial safety notes 15 3 10 Further safety notes 17 4 Product Overview 18 4 1 Construction types 18 4 2 Overview of product features 19 4 3 Function carrier with power module 21 5 Transport and storage...

Page 4: ...3 Specific functions of the Ethernet interface 43 11 4 Other functions and features 43 11 5 Display elements 43 11 6 Interfaces 44 12 Maintenance Hardware 45 13 Final Shutdown and Disposal 46 14 Serv...

Page 5: ...They can also be used in building automation systems due to the fact that they can run on AC voltage The application temperature range is 25 C to 70 C Read and understand these instructions before ins...

Page 6: ...naged Switch over its entire product life cycle from delivery to disposal Other documents apply in addition to these operating instructions See also chapter 2 7 Applicable documents on page 11 in this...

Page 7: ...d product names in this document are trademarks or registered trademarks by titleholder 2 3 Disclaim of Liability The document was written under consideration of the applied standards regulations and...

Page 8: ...61000 6 2 2015 EN 61000 6 4 Electromagnetic compatibility EMC Part 6 4 Generic standards Emission standard for industrial environments IEC 61000 6 4 2006 A1 2010 German version EN 61000 6 4 2007 A1 20...

Page 9: ...ntification plate which has the following structure is located on the device Abb 1 Identification plate example The identification label contains the following information 1 Part number 2 Assembly des...

Page 10: ...rectives 91 263 EEC 92 31 EEC and 93 68 EEC The EU Declaration of Conformity is kept available for the competent authorities in accordance with the above mentioned EU directives Friedrich L tze GmbH B...

Page 11: ...al device pursuant to part 15 of the FCC Rules These limits are designed to provide reasonable protection against harmful interference in a residential installation This equipment generates uses and c...

Page 12: ...on or encounter special problems that are not dealt with in sufficient detail in the operating instructions you can request the necessary information about service from L tze See chapter 14 Service on...

Page 13: ...automation These instructions must be read and understood before installing operating or maintaining the device Risk of injury and damage to property due to non observance of the applicable documents...

Page 14: ...s based on the EN IEC 61709 is calculated and defined Correct and safe operation of the product requires proper transport storage installation and assembly as well as careful operation and maintenance...

Page 15: ...ations on and with the product 3 5 1 3 Electrically qualified persons The employee has a technical education in the required field The employee is capable to perform special operations on and with the...

Page 16: ...nd in writing previously approved by Friedrich L tze GmbH 3 8 Safety device 3 9 Special safety notes LCOS Unmanaged Switches are state of the technology and comply with the applicable safety regulatio...

Page 17: ...power supply and check the connections after applying power Accidents during installation or maintenance due to electrical voltages When carrying out installation or maintenance work disconnect the m...

Page 18: ...d national ruls and standards ATTENTION The supply cable must be suitable for an operating temperature range of 25 C to 70 C The connecting cables must be designed for the ambient temperature To ensur...

Page 19: ...DI X QoS unmanaged Switch 4 ports 4 1 2 779200 0801 Unmanaged Switch 8 ports Abb 3 10 100 Mbit auto negotiation Auto MDI MDI X QoS unmanaged Switch 8 ports 4 1 3 779201 0401 Unmanaged Switch 4 ports A...

Page 20: ...es have eight 10 100 Mbps twisted pair ports 10 100BASE TX RJ45 connectors Twisted pair devices or other TP TX segments can be connected to the ports The TP ports support auto negotiation auto polarit...

Page 21: ...ules for data and power supply are available in different widths The housings can be equipped with their own printed circuit boards as required Information on the equipment and size of these can be fo...

Page 22: ...function carrier is the basis for the LCOS Unmanaged Switch The LCOS Unmanaged Switch is plugged onto the function carrier and can then be snapped onto the DIN rail The power and data module for setti...

Page 23: ...Avoid product damage due to incorrect storage conditions Protect the equipment from extreme temperatures and humidity Store the units in dry rooms between 40 and 85 C Make sure that the humidity is le...

Page 24: ...listed below is missing or damaged please contact the service department chapter 14 Service on page 47 Part No Type Terminati on data Included accessories 779200 0401 LCOS SW 4P 4 x RJ 45 779200 0801...

Page 25: ...Observe ESD regulations when unpacking Install and use only undamaged products Do not use damaged parts a function according to the specifications of the device is then no longer guaranteed If damage...

Page 26: ...delivery see chapter 6 2 Accessories on page 23 Internal connector to LCOS FT power supply 7 1 1 Standalone Version No Description 1 Connector X10 5 pole internal 2 X9 Push In terminal Power Supply 3...

Page 27: ...direct contact power module 10 Side cover for function carrier 11 Power bridge 1 pole insulated 4x per function carrier 3RZHUEXV Color Status Activity Operating status green on ON OK Switch active of...

Page 28: ...AC DC 24 V extended temperature range Type LCOS SW 4P LCOS SW 8P Part No 779200 0401 779200 0801 779201 0401 779201 0801 The complete and current technical data can be found in the corresponding data...

Page 29: ...sembly and disassembly With AC supply an external overvoltage protection must limit the voltage between supply and FE to less than 1000 V For UL applications Ambient temperature 70 C The module must b...

Page 30: ...hat like profile In English the DIN rail is called DIN rail 9 2 1 Safety notices Environment The device may only be installed by competent and qualified personnel This work step may only be carried ou...

Page 31: ...ied out by at least trained stuff With the variants with function carriers 779201 0401 and 779201 0801 the switch can be mounted directly on a DIN rail The plug in terminal can be removed for easier w...

Page 32: ...401 779201 0801 included in delivery see accessories The function carriers are delivered with open locking slides Check the position of the locking slide before mounting the module The locking slides...

Page 33: ...S P O R T A T I O N 9 2 2 4 Mounting of Function carriers 1 Place the function carrier on the up per part of the top hat rail 2 Pivot the function carrier to the bottom of the top hat rail 3 Push the...

Page 34: ...rsons and destroy the modules assemblies Disconnect the system from the power supply before assembly and disassembly This step must be carried out by at least trained staff For this step you will need...

Page 35: ...LCOS Unmanaged Switch Mounting Dismounting 34 T R A N S P O R T A T I O N 4 Take the function carrier off the top hat rail...

Page 36: ...the complete module only use the plug in terminals recommended by us See chapter 6 2 Accessories on page 23 For UL applications An UL approved 3A fuse must be connected upstream of the device A screwd...

Page 37: ...LNHO 3DUW 26 6 3 5 SRZHU VXSSO JUHHQ 6 7 1 1 9 1 9 26 7 DWD VRODWLRQ 9 1 7 9 5 6KLHOG 8PLQ LQN FWLYLW UWLNHO 3DUW 26 6 3 5 SRZHU VXSSO JUHHQ 6 7 1 1 9 1 9 26 7 DWD VRODWLRQ 9 1 7 9 5 6KLHOG 8PLQ LQN F...

Page 38: ...ting 37 T R A N S P O R T A T I O N 9 5 Further information on the LCOS system basics System configuration 1 PE connection 2 Supply voltage 3 Supply module 4 Supply module intermediate supply 5 PE con...

Page 39: ...nd also to prevent mistakes when assembling the modules the function housing and the function carrier can be coded 1 Plug the coding pins into the slots of the function housing and the carrier 2 Set t...

Page 40: ...a data bridge or 2 a power bridge Different combinations are possible Two bridged function carriers 22 5 mm The carrier to the right is not displayed 1 2 Further information on the LCOS system can be...

Page 41: ...ons The earth connection of the device serves exclusively as functional earth FE according to EN 61131 2 The supply voltage is galvanically isolated from the housing The devices can be supplied either...

Page 42: ...thorised by L tze The upper and lower ventilation slots must not be covered so that the air can circulate freely The distance to the ventilation slots of the housing must be at least 30 mm Never inser...

Page 43: ...The packet buffer size is 448k bits 11 2 2 Multi address capability A switch learns all source addresses per port Only packages with unknown addresses these addresses or a multi broadcast address in...

Page 44: ...ctions of the Ethernet interface 11 3 1 Polarity reversal Auto Polarity If the pair of receiving lines is incorrectly connected RD and RD reversed the polarity is automatically reversed 11 3 2 Auto MD...

Page 45: ...ected only to internal Ethernet networks without exiting a facility and being subjected to TNVs To avoid electric shock this device may only be connected to Ethernet networks within a building that ar...

Page 46: ...on 49 7151 60530 Telefax 49 7151 6053277 E Mail info luetze de Switch off the input voltage before installation maintenance or conversi on work and secure it against unintentional restarting Prevent f...

Page 47: ...edrich L tze GmbH from the responsibilities of 10 passage 2 Elek troG Take back obligation of the manufacturer and any third party in this content If the product is handled to a commercial third party...

Page 48: ...ntact us Friedrich L tze GmbH Bruckwiesenstra e17 19 71384 Weinstadt GERMANY DEUTSCHLAND Telefon 49 7151 60530 Telefax 49 7151 6053277 E Mail info luetze de The device does not contain any service com...

Page 49: ...ng instructions 2 Data sheet for 779200 0401 3 Type Test Certification for 779200 0401 4 Material Confirmation for 779200 0401 5 CE certification 6 UL certification 7 FCC Test Report 1 These operating...

Page 50: ...EMC Electromagnetic compatibility it refers to the absence of inter ference between electrical or electronic equipment and its en vironment EN European standard the standardization of CEN CENELEC and...

Page 51: ...gabits per second Mega stands for one million PB The Power bus is the energy bus of the LCOS system PE Protective Earth for protective conductors in electrical en gineering Rx Receiving line TS 35 DIN...

Page 52: ...history Subject to technical changes These operating instructions must be kept for further use Revision Description Date 00 New document 2018 09 17 01 3 4 Product life NEW Reference to corresponding...

Page 53: ...43 0 1 257 52 52 20 office luetze at Switzerland L TZE AG Oststra e 2 CH 8854 Siebnen SZ Tel 41 0 55 450 23 23 Fax 41 0 55 450 23 13 info luetze ch USA LUTZE INC info lutze com Great Britain LUTZE Lt...

Reviews: