7.5 Completing the installation
The cable screw connections must be tightened and all housings closed
after assembly in order to ensure the IP protection class of the installa-
tion.
Any paint coverings damaged during assembly must be repaired to
prevent corrosion from an aggressive atmosphere.
All union nuts on the screw connections of the piping are tightened by
hand.
7.6 Installation example
Fig. 14:
M
Installation example
Position
Description
Position
Description
A
Room for the chlorine gas supply
8
Changeover unit with 5 service valves
B
Dosing device room
9
Dosing device
1
Chlorine barrel
10
Injector with non-return valve
2
Chlorine barrel scale
11
Motive water pump
3
Pressurised manifold
12
Gas warning device
4
Chlorine gas filter
13
Horn
5
Moisture eliminator with heating collar
14
Gas sensor
6
Vacuum regulator
15
Entrance port of the chlorine eliminator
7
Activated carbon cartridge
Table 15: Designation of components
A
B
12
1
2
3
6
8
7
9
10
13
5
11
15
4
14
Summary of Contents for C 2526
Page 2: ......
Page 46: ...Index 46 Lutz Jesco GmbH 2016 BA 20901 02 V01 Chlorinator C 2526 Operating instructions...
Page 48: ......