
LUMBERG
CONNECT
GMBH
Im Gewerbepark 2
58579 Schalksmühle
Processing Instruction
Circular connectors
AISG – Next Generation
03V01EN
Page 13 of 15
3. Disassembly instructions
Step 1: Loosen the cap nut
Caution! The cap nut must be loosened using two 18-mm open-end wrenches.
Step 2: Further disassembly is carried out in reverse order.
SW18