Figure 4.12 Typical side-stream connection set-up used during calibration
4.3.5 Span Calibration
Turn ON the Multi Gas Monitor. You need to let the Multi Gas Monitor –
INNOVA 1316A-1 warm up for at least 5 minutes. For optimum span
calibration accuracy, let the Multi Gas Monitor –INNOVA 1316A-1 warm
up for at least 30 minutes.
While the Multi Gas Monitor –INNOVA 1316A-1 is warming up, perform
the following steps:
1)
If a New NO Sensor is required see the Status window
install a new NO sensor Order number VM0201A.
2)
If the New O
2
Sensor is required see the Status window
install a new O
2
sensor. Order number VM0200A.