Installation Manual
Powering
Powering and Testing Procedures
Powering & Battery
Grounding
Perform the following steps listed in the table below to power the WaveStar OLS
40G or OT shelf:
(Continued on next page)
Step
Action
Reference
1
Verify that all packing material has been removed from
the cabinet and shelf.
2
Verify that the breakers at the Battery Distribution and
Fuse Bay (BDFB) are in the OFF position, or if fuses are
utilized, verify that the fuses are not installed.
3
Verify all circuit packs are unseated from all shelves.
NOTE:
The OMU and ODUs may be seated at this time.
They are not connected to battery voltage.
4
Remove the fuses from both fuse holders on each shelf.
a.
Open the retainer by lifting up on the bottom edge
of the retainer.
b.
Press lightly down on the top edge of the fuse
cap.
c.
The fuse cap will pop out.
5
Using an ohmmeter, measure the resistance from the
top terminal inside each fuse holder to frame ground.
NOTE:
For an Integrated Bay, follow the steps for both the
WaveStar OLS 40G shelf and for the OT shelves.
Requirement: The resistance should show an open
circuit (more than a megaohm reading) for each fuse
holder. If the resistance measurement requirement is not
met then check the battery cables.
For OLS, see
Figure 7-1.
For OT, see
Figure 7-2.
Summary of Contents for WaveStar OLS 40G
Page 4: ......
Page 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Page 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Page 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Page 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Page 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Page 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Page 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Page 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Page 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Page 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Page 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...