Issue 1.0
March 2001
4-21
365-575-389
Installation Manual
Power Cable Installation
Integrated Bay
Introduction
The OLS and the OT are both powered by –48 volt direct current. Since redundant
power is used to ensure maximum availability of the terminal, two battery power
feeds are required for each terminal (feed A is RED and feed B is BLUE).
For power cable installation information of multiple OLS shelves in a single bay,
single OLS or OT shelves, or multiple OT shelves in the same bay, refer to the
appropriate section of this chapter.
Power
Requirements
The power requirements for OLS and OT integrated bay are as follows:
■
Two feeders (A and B) are required for powering the cabinet.
■
Each independent feeder must supply –48 volts direct current and a return.
■
Each feeder capacity must be 20 amperes at the BDFB.
Available Power
Cables
Table 4-5 lists power cables available for installing a WaveStar OLS 40G
Integrated Bay.
Table 4-5.
Available Power Cables for Integrated OLS/OT
ED-9C103-22
Cable Group
Cable Type
Cable
Length (ft.)
Use With
Power Bus
Color
23
WHICS 2998400000
15
A
Red
24
WHICS 2998400000
15
B
Blue
25
WHICS 2998400000
100
A
Red
26
WHICS 2998400000
100
B
Blue
Summary of Contents for WaveStar OLS 40G
Page 4: ......
Page 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Page 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Page 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Page 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Page 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Page 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Page 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Page 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Page 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Page 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Page 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...