It is required that the
LambdaUnite
®
MSS product be installed using this Installation
Guide. Furthermore, this document needs to be completed as an initial requirement to
activating technical support services such as Remote Technical Support (RTS).
At the end of each part in this guide, there are exit checklists to verify that all stages
of the
LambdaUnite
®
MSS installation and integration were properly and successfully
completed in accordance with Lucent standards as specified in this guide.
It is important that all of the following checklists and tables are accurately completed
and signed:
•
“Physical and power installation exit checklist” (p. 6-2)
•
“Power supply measurements” (p. 6-3)
•
“NE provisioning and stand-alone installation test exit checklist” (p. 9-2)
•
“Optical output power measurements” (p. 9-3)
•
“Network establishment and testing exit checklist” (p. 11-2)
•
These checklists and tables are included in this guide on the pages indicated above.
How to order
This information product can be ordered with the order number 365-374-187 at the
Customer Information Center (CIC), see http://www.cic.lucent.com/.
An overview of the ordering process and the latest software & licenses information is
given in the
LambdaUnite
®
MSS Applications and Planning Guide, chapter 7.
How to comment
To comment on this information product, go to the
http://www.lucent-info.com/comments/enus/
) or email your comments to the
Comments Hotline ([email protected]).
As customer satisfaction is extremely important to Lucent Technologies, every attempt
is made to encourage feedback from customers about our information products. Thank
you for your feedback.
About this information product
.................................................................................................................................................................................................................................
xxxviii
Lucent Technologies - Proprietary
See notice on first page
365-374-187
Issue 1, December 2005
,