Final checklist
....................................................................................................................................................................................................................................
Verify that all chapters in this manual have been passed completely.
Chapter
Passed
(Yes, No)
Initials
Notes
Mechanical installation
System cabling
System turn up procedures
System provisioning
Stand alone test procedures
Network establishment and
test
If all chapters have been passed successfully, please sign the
Completion Form.
Conclusion
....................................................................................................................................................................................................................................
9 - 2
Lucent Technologies
365-374-074
Issue a, April 2002