
Cable Duct Position 2200mm Bottom Access (300mm)
....................................................................................................................................................................................................................................
2200 mm Rack Frames
Legend:
Item 1
Fiber-Cable Duct, Assy – 848593158
Item 2
Fiber-Cable Duct, Assy – 848593141
*1
Make a clove hitch around the optical connector
to feed the connector through the cable duct.
X refers to:
RACK FRAME
Top subrack
Middle subrack
Bottom subrack
2200 mm with 2 Subracks
X = hole 21
—
X = hole 60
2200 mm with 3 Subracks
X = hole 21
X = hole 47
X = hole 73
Figure B-7 2200 mm Rack Frame
Site Configurations
....................................................................................................................................................................................................................................
365-312-761
Issue 1, May 2004
Lucent Technologies - Proprietary
See notice on first page
B - 9