Lucent Technologies ECS Minicell Battery Plant H569-420
Issue 5 February 1997
Engineering and Ordering 3 - 13
24. Group C includes CP3 circuit pack, a set of current
limiting resistor assemblies, and a product manual.
25. Group D includes CP3 circuit pack, a remote termination
panel with a cable set, a set of current limiting resistor
assemblies, and a product manual.
26. Current limiting resistor assemblies are required to install
CP3 and are calibrated into the datalogger. Analog channel
readings will not be accurate without these resistors. In
addition, these resistors ensure that field wiring to CP3
meets NEC Class 2 limits.
27. Group 4 rectifier shelf is mounted in the top position,
below the output distribution panel (Group 7 or 8) and
houses rectifiers 1 through 3.
28. The Group 5 rectifier shelf is mounted directly below the
ECS controller (Group 6) and houses rectifiers 4 through 6.
29. Order battery stand and batteries for Group 1 framework
and the batteries for Group 10 battery stand from the table
below. The 12-RHD 600 includes battery stand and one
string of 24V 600AH batteries. For the 2VR375E battery,
12 batteries equals one string.
30. Order battery cable kits from the table below. The C&D
batteries and stand for Group 1 will require two cable kits.
The Group 10 battery stand requires one cable kit per
battery string.
Table 3-O: Battery Stand and Batteries
Framework
Description
Apparatus
Code
Comcode
Group 1
Battery String and Stand
12-RHD 600
407271824
Group 2 e/w 10
Battery
2VR375E
406020347
Table 3-P: Battery Cable Kits
Framework
Quantity
Description
Comcode
Group 1
2
Battery Cable Kit
846481240
Group 2 e/w 10
1
Battery Cable Kit
846481240