2.3 Post-Installation Checklist
After completing the installation, check the items in the following table to make sure
that the inverter has been safely and correctly installed.
Items
Details
Ref.
Result
Installation
Location/Power
I/O Verification
Is the installation location appropriate?
Does the environment meet the inverter’s
operating conditions?
Does the power source match the inverter’s rated
input?
Is the inverter’s rated output sufficient to supply
the equipment?
(Derating is applied in specific conditions. Refer to
11.8 Continuous Rated Current Derating
Power Terminal
Wiring
Is a circuit breaker installed on the input side of the
inverter?
Is the circuit breaker correctly rated?
Are the power source cables correctly connected
to the input terminals of the inverter?
(Caution: connecting the power source to the
U/V/W terminals may damage the inverter.)
Are the motor output cables connected in the
correct phase order?
(Caution: motors will rotate in reverse direction if
the three phase cables are not wired in the correct
rotation.)
Are the cables used in the power terminal
connections correctly rated?
Is the inverter grounded correctly?
Are the power terminal screws and the ground
terminal screws tightened to their specified
torques?
Are the overload protection circuits installed
correctly on the motors (if multiple motors are run
using one inverter)?
-
Is the inverter separated from the power source by
a magnetic contactor (if a braking resistor is in
use)?
Are advanced-phase capacitors, surge protection
and electromagnetic interference filters installed
correctly?
(These devices MUST not be installed on the
output side of the inverter.)
Summary of Contents for G100
Page 14: ......
Page 16: ...5 5 7 5 kW 3 Phase ...
Page 32: ...0 4 0 8 kW 1 5 2 2 kW 4 0 kW ...
Page 48: ......
Page 68: ......
Page 81: ......
Page 100: ......
Page 116: ...trips automatic Reset Restart is not attempted and the Fire Mode Count is not increased ...
Page 118: ......
Page 130: ... Terminal connections for 3 wire operation 3 wire operation ...
Page 140: ... PID control block diagram ...
Page 165: ...Code and Features Description Code Description continuous rating ...
Page 170: ......
Page 186: ... Displayed as on the Keypad ...
Page 200: ...provided signal output at 150 36 sec ...
Page 216: ...Code and Features Description delay time delay time ...
Page 219: ......
Page 237: ......
Page 253: ......
Page 295: ......
Page 314: ......
Page 335: ...Manual Revision History Revision History No Date Edition Changes 1 2019 01 First Release ...