CLASSIC SERIES INSTALLATION GUIDE
Tools Required
Aluminium blade + chop saw
(if posts cut on site)
Level or Laser
Drill + drill bit
#1 Robinson bit
2mm Allen Key
Supplied Hardware
Stainless Steel M2.5 bolt (1 per fi n)
#6 Specialty screw (1 per hole in back of post)
NOTE:
Ensure adequate backing in wall, 1-1/2”
backing recommended. Wall anchors may be
required if fastening to masonry.
Additional Suggested Tools
Makita 1/4” Hex Driver Drill
(DF012D), torque setting 5
DeWalt 12” Extension (DW1589)
AM-2mm Apex 1/4” Socket Head
1.
Remove components from packaging. Be sure to recycle!
Confi rm fi n supports supplied matches type, colour and
quantity as per Liquid Systems order.
2.
Determine location on wall.
Note:
Ensure adequate bottle space either side to existing
and future objects. See Specifi cation Guide for spacing
requirements.
Note:
If light shelves are integral to purchased display, refer to
Light Shelf Installation guide for wiring locations.
3.
Mark edge or centreline of post on, or close to fl oor.
4.
By use of a level or laser, mark the edge or centerline of post
on or close to the ceiling to ensure a plumb installation.
5.
If posts are cut on site: Measure overall fl oor to ceiling height
at marked location and cut post to length using an aluminium
blade and chop saw.
(Diagram #1)
Note:
Be sure to trim the correct end as key holes are specifi c
to this vertical orientation.
Note:
If multiple posts are being installed, ensure level and
alignment of bottle display. First post (or multiple posts) may
need to be trimmed top and bottom to gain a level installation
over multiple posts.
6.
Lean post against a wall and align with top and bottom edge
markings laid out from step #4 and #5.
7.
Mark holes with pencil per hole in back of post.
(Diagram #2)
8.
Set aside post and pre-drill into wall surface and blocking
behind with a 1/16” (1.5mm) drill bit, ensuring alignment with
markings from previous step.
(Diagram #3)
Note:
If light shelves are part of the installation, refer to
Light Shelf Installation guide for wiring instructions prior to
securing post to wall.
9.
Secure post with #6 Specialty screws (supplied).
(Diagram #4)
10.
Repeat steps #2 to #9 for multiple post installations, ensuring
adequate space between posts. (Refer to Specifi cation Guide
for spacing requirements)
11.
Open packaging with fi n supports and remove hardware
from packaging.
Note:
Supplied hardware = 1 x M2.5 Stainless Steel bolt per fi n.
[Penci
l]
[Penci
l]
[Penci
l]
[Penci
l]
Diagram #2
:: Mark holes on wall
[Drill]
[Drill]
[Drill]
[Drill]
Diagram #1
:: Cut post to legth
Diagram #3
:: Pre-drill holes in wall