218
Learning Advanced Features
Code
Description
AP3-13
–AP3-22
Period 1~4 Day
The Time period date for the operation can be set up to 4. It can be
set on a weekly basis. If the bit is ‘1 (on)’, it indicates the relevant
day is selected. If
the Bit is ‘0 (off)’, it indicates the relevant day is
not selected.
Bit
6
5
4
3
2
1
0
Sunday
Monday
Tuesday Wednesday Thursday Friday
Saturday
AP3-30
–AP3-51
Exception1
–8 Start T
The operation start time for the 8 Exception days can be set.
AP3-31
–AP3-52
Exception1
–8 Stop T
The operation end time for the 8 Exception days can be set.
AP3-32
–AP3-53
Exception1
–8 Date
The date for the 8 Exception days can be set.
AP3-70 Time Event En
Enables or disables the Time Event
Setting
Function
0
No
Time Event is not used.
1
Yes
Time Event is used.
AP3-71 T-Event Status
It shows which T-Event from 1
–8 is being performed.
7
6
5
4
3
2
1
0
T-
Event
8
T-
Event
7
T-
Event
6
T-
Event
5
T-
Event
4
T-
Event
3
T-
Event
2
T-
Event
1
AP3-72
–86 T-Event1–8
Period
Select the desired module of the Time Module and Exception Day
set in AP3-11
–AP3-53 for the relevant events.
If the bit is 1, it indicates the relevant Time Module or Exception Day
is selected. If the Bit is 0, it indicates the Time Module or Exception
Day is not selected.
bit
11
10
9
8
7
6
5
4
3
2
1
0
E
x
c
e
p
tio
n
D
a
te
8
E
x
c
e
p
tio
n
D
a
te
7
E
x
c
e
p
tio
n
D
a
te
6
E
x
c
e
p
tio
n
D
a
te
5
E
x
c
e
p
tio
n
D
a
te
4
E
x
c
e
p
tio
n
D
a
te
3
E
x
c
e
p
tio
n
D
a
te
2
E
x
c
e
p
tio
n
D
a
te
1
P
e
rio
d
4
P
e
rio
d
3
P
e
rio
d
2
P
e
rio
d
1
AP3-73
–87 T-Event1–8
Define
Select the desired Event.
Setting
0
None
16 PID Openloop
1
Fx
17 PID Gain 2
Summary of Contents for LSLV-H100 Series
Page 17: ...Preparing the Installation 4 37 90 kW 3 Phase ...
Page 18: ...Preparing the Installation 5 110 132 kW 3 Phase ...
Page 19: ...Preparing the Installation 6 160 185 kW 3 Phase ...
Page 20: ...Preparing the Installation 7 220 250 kW 3 Phase ...
Page 21: ...Preparing the Installation 8 315 400 kW 3 Phase ...
Page 22: ...Preparing the Installation 9 500 kW 3 Phase ...
Page 35: ...Installing the Inverter 22 ...
Page 50: ...37 Installing the Inverter Input and Output Control Terminal Block Wiring Diagram ...
Page 104: ...91 Learning Basic Features 0 10 V Input Voltage Setting Details V1 Quantizing ...
Page 181: ...168 Learning Advanced Features PID Command Block ...
Page 182: ...169 Learning Advanced Features ...
Page 183: ...170 Learning Advanced Features PID Feedback Block ...
Page 184: ...171 Learning Advanced Features PID Output Block ...
Page 185: ...172 Learning Advanced Features PID Output Mode Block ...
Page 198: ...185 Learning Advanced Features EPID1 Control block ...
Page 199: ...186 Learning Advanced Features EPID2 Control block ...
Page 220: ...207 Learning Advanced Features ...
Page 235: ...222 Learning Advanced Features The Time Chart for the Exception Day ...
Page 506: ...Table of Functions 493 ...
Page 520: ...Table of Functions 507 8 16 4 Cooling Tower MC4 Group ...
Page 549: ...Troubleshooting 536 ...
Page 569: ...Technical Specification 556 11 3 External Dimensions 0 75 30 kW 3 phase 37 90 kW 3 phase ...
Page 570: ...Technical Specification 557 110 185 kW 3 phase ...
Page 601: ...588 ...
Page 602: ...589 ...
Page 603: ...590 ...