Learning Advanced Features
In the graph above, Pipe Break occurs if the feedback is smaller than the value calculated
by multiplying the two values set at PID-04 and PRT-61(PID-04 x PRT-61) at the inverter
’s
maximum output (when PID output is the maximum set value, or the inverter is running at
the frequency set at DRV-20).
5.20 Pre-heating Function
This function uses current to heat up the motor or pump to avoid the motor or the pump
freezing when they are not in operation.
Group Code
Name
LCD Display
Parameter Setting
Setting Range Unit
AP2
48
Initial heating
output current
Pre Heat Level
20
1
–100
%
49
Initial heating
output duty
Pre Heat Duty
30
1
–100
%
50
DC input delay
time
DC Inj Delay T
60.0
0.0
–600.0
sec
IN
65
–
71
Terminal block
input 1
–7
P1
–7 Define
44
Pre Heat
-
Initial Heating Setting Details
Code
Description
AP2-48 Pre Heat Curr
Sets the current to be used for initial heating. Sets the current to
motor no-load current % value.
AP2-49 Pre Heat Duty
Sets the duty (time) for the current to be used for initial heating, from
10 seconds to % value.
AP2-50 DC Inj Delay
T
Sets a certain delay time to prevent from an over current trip that may
occur when a DC input is performed after the inverter Free-Run stop.
IN-65
–71 P1–7 Define Performs the Pre Heat function if the Pre Heat (44) terminal is set.
The initial heating function continually operates when the set multi-function input terminal is
on and until the inverter command is on. If an inverter command is input while the initial
heating function is operating, the inverter starts operation immediately.
Summary of Contents for LSLV-H100 Series
Page 17: ...Preparing the Installation 4 37 90 kW 3 Phase ...
Page 18: ...Preparing the Installation 5 110 132 kW 3 Phase ...
Page 19: ...Preparing the Installation 6 160 185 kW 3 Phase ...
Page 20: ...Preparing the Installation 7 220 250 kW 3 Phase ...
Page 21: ...Preparing the Installation 8 315 400 kW 3 Phase ...
Page 22: ...Preparing the Installation 9 500 kW 3 Phase ...
Page 35: ...Installing the Inverter 22 ...
Page 50: ...37 Installing the Inverter Input and Output Control Terminal Block Wiring Diagram ...
Page 104: ...91 Learning Basic Features 0 10 V Input Voltage Setting Details V1 Quantizing ...
Page 181: ...168 Learning Advanced Features PID Command Block ...
Page 182: ...169 Learning Advanced Features ...
Page 183: ...170 Learning Advanced Features PID Feedback Block ...
Page 184: ...171 Learning Advanced Features PID Output Block ...
Page 185: ...172 Learning Advanced Features PID Output Mode Block ...
Page 198: ...185 Learning Advanced Features EPID1 Control block ...
Page 199: ...186 Learning Advanced Features EPID2 Control block ...
Page 220: ...207 Learning Advanced Features ...
Page 235: ...222 Learning Advanced Features The Time Chart for the Exception Day ...
Page 506: ...Table of Functions 493 ...
Page 520: ...Table of Functions 507 8 16 4 Cooling Tower MC4 Group ...
Page 549: ...Troubleshooting 536 ...
Page 569: ...Technical Specification 556 11 3 External Dimensions 0 75 30 kW 3 phase 37 90 kW 3 phase ...
Page 570: ...Technical Specification 557 110 185 kW 3 phase ...
Page 601: ...588 ...
Page 602: ...589 ...
Page 603: ...590 ...