192
Learning Advanced Features
Group Code Name
LCD Display
Parameter Setting Setting Range
Unit
(1000 Ton)
2
97
Reset Energy
payback
parameter
Reset Energy 0
0 No
-
1 Yes
Energy Payback Value Function Setting Details
Note
Note that the actual saved energy may differ from the displayed values, since the resulting
values are affected by user-defined codes such as AP2-87 and AP2-88.
5.14 Pump Clean Operation
The pump clean operation is used to remove the scales and deposits attached on the
impeller inside a pump. This operation keeps the pump clean by performing a repetitive run-
Code
Description
AP2-87 M1 AVG PWR
Sets the average power value of the #1 motor and calculates the
energy savings based on the set value.
AP2-88 M2 AVG PWR
Sets the average power of the #2 motor and calculates energy
savings based on the set value.
AP2-89 Cost per kWh
Sets the cost per 1 kWh. Multiply the energy payback counter value
with the value set at AP2-89 to calculate the total saved cost. This
value is displayed in AP2-92
–93.
AP2-90 Saved kWh
AP2-91 Saved MWh
Displays the saved energy in kWh (AP2-90) and MWh (AP2-91).
When the value reaches 999.9 (kWh) and continues to increase,
AP2-91 becomes 1 (MWH), AP2-90 resets to 0.0, and it continues
to increase.
AP2-92 Saved Cost1
AP2-93 Saved Cost2
Displays the saved cost to the one-tenth place at AP2-92. When the
value reaches 999.9 and continues to increase, AP2-93 becomes 1,
AP2-92 resets to 0.0, and it continues to increase.
AP2-94 CO2 Factor
Sets the CO2 reduction rate per 1 MW (default value=0.5). The
value is multiplied with AP2-90 and AP2-91, and the resulting values
are displayed at AP2-95 and AP2-96.
AP2-95 Saved CO2-1
AP2-96 Saved CO2-2
Displays the CO2 reduction rate in tons (AP2-95) and kilo-tons
(AP2-96).
AP2-97 Reset Energy
Resets all the saved energy parameters.
Summary of Contents for LSLV-H100 Series
Page 17: ...Preparing the Installation 4 37 90 kW 3 Phase ...
Page 18: ...Preparing the Installation 5 110 132 kW 3 Phase ...
Page 19: ...Preparing the Installation 6 160 185 kW 3 Phase ...
Page 20: ...Preparing the Installation 7 220 250 kW 3 Phase ...
Page 21: ...Preparing the Installation 8 315 400 kW 3 Phase ...
Page 22: ...Preparing the Installation 9 500 kW 3 Phase ...
Page 35: ...Installing the Inverter 22 ...
Page 50: ...37 Installing the Inverter Input and Output Control Terminal Block Wiring Diagram ...
Page 104: ...91 Learning Basic Features 0 10 V Input Voltage Setting Details V1 Quantizing ...
Page 181: ...168 Learning Advanced Features PID Command Block ...
Page 182: ...169 Learning Advanced Features ...
Page 183: ...170 Learning Advanced Features PID Feedback Block ...
Page 184: ...171 Learning Advanced Features PID Output Block ...
Page 185: ...172 Learning Advanced Features PID Output Mode Block ...
Page 198: ...185 Learning Advanced Features EPID1 Control block ...
Page 199: ...186 Learning Advanced Features EPID2 Control block ...
Page 220: ...207 Learning Advanced Features ...
Page 235: ...222 Learning Advanced Features The Time Chart for the Exception Day ...
Page 506: ...Table of Functions 493 ...
Page 520: ...Table of Functions 507 8 16 4 Cooling Tower MC4 Group ...
Page 549: ...Troubleshooting 536 ...
Page 569: ...Technical Specification 556 11 3 External Dimensions 0 75 30 kW 3 phase 37 90 kW 3 phase ...
Page 570: ...Technical Specification 557 110 185 kW 3 phase ...
Page 601: ...588 ...
Page 602: ...589 ...
Page 603: ...590 ...