
Adjustment and Maintenance
4
4.1.1.11.Pumping Down the Dropping Chamber
See Appendix B for instructions on pumping down the dropping chamber.
4.2. The Interferometer
4.2.1.ALIGNMENT
1. Set up the superspring and attach the interferometer base as described in the
setup instructions.
2. Center the precision bubble vials mounted on the base of the superspring by
adjusting the leveling feet on the superspring tripod.
3. Turn on the laser.
4. Roughly collimate the laser beam on the ceiling or on a target above the
interferometer base. The collimating assembly is on the output end of the
laser fiber. Use a 2.5 mm Allen wrench to remove the collimating assembly
from the interferometer. Adjust the collimation of the beam by loosening the
locking screw (2.5 mm Allen screw) on the slide of the fiber input and moving
the slide. A properly collimated beam should have a diameter of 6 mm.
5. Slide the loosened assembly back into the interferometer (note the orientation
key) and precisely collimate the laser beam by use of the slide until the beam
size in the collimating telescope is minimized.
6. Tighten the locking screw on the slide. Then tighten the assembly into the
interferometer using the second Allen screw
7. Remove the dust plug on the top of the interferometer base and place the
dropping chamber tripod and dropping chamber on top of the interferometer
(see setup instructions).
8. If possible (both spots visible), verticalize the beam as described in the setup
instructions.
9. Slightly loosen the two screws directly above the fiber optic input on the
interferometer base, just sufficient to allow movement of the fiber optic input
stage.
4-10
Summary of Contents for Micro-g LaCoste FG5
Page 7: ...Table of Figures This Page is Intentionally Blank vii ...
Page 8: ......
Page 13: ...Design Components and Function 2 Figure 2 3 Side view of the dropping chamber 2 3 ...
Page 23: ...Design Components and Function 2 Figure 2 9 The Superspring 2 13 ...
Page 31: ...Design Components and Function 2 Figure 2 12 Rotation Monitor 2 21 ...
Page 32: ...Design Components and Function 2 This Page is Intentionally Blank 2 22 ...
Page 36: ...How to Set Up and Run the FG5 3 Figure 3 1 Superspring Interferometer Setup 3 4 ...
Page 56: ......
Page 59: ...Adjustment and Maintenance 4 4 3 ...
Page 78: ...Adjustment and Maintenance 4 4 22 ...
Page 106: ......
Page 138: ...Checklists and Logs Appendix D Measure gap between two levers near ZPM 9 24 ...
Page 143: ...Checklists and Logs Appendix D This Page is Intentionally Blank 9 29 ...
Page 144: ......