Checklists and Logs
Appendix D
Remove top drag-free cover from cart and pull out of the way (do
not detach or damage wires connected to it).
Note orientation of top part of test mass to V-plate.
Remove top part of test mass from posts which pass through V-
plate.
Lower bottom part of test mass through V-plate.
Remove old V-plate and replace with new one.
Reverse procedure to reassemble.
Table 9-9 Replacing V-Plate
9.4.7.Replacing the Linear Bearings
Replacing Linear Bearings Checklist
Remove dropping chamber cover.
Remove drive belt.
Remove top rod ring.
Remove upper bumper stop assembly.
Remove ribbon cable wires and clamp from cart.
Lift cart off guide rods.
9-11
Summary of Contents for Micro-g LaCoste FG5
Page 7: ...Table of Figures This Page is Intentionally Blank vii ...
Page 8: ......
Page 13: ...Design Components and Function 2 Figure 2 3 Side view of the dropping chamber 2 3 ...
Page 23: ...Design Components and Function 2 Figure 2 9 The Superspring 2 13 ...
Page 31: ...Design Components and Function 2 Figure 2 12 Rotation Monitor 2 21 ...
Page 32: ...Design Components and Function 2 This Page is Intentionally Blank 2 22 ...
Page 36: ...How to Set Up and Run the FG5 3 Figure 3 1 Superspring Interferometer Setup 3 4 ...
Page 56: ......
Page 59: ...Adjustment and Maintenance 4 4 3 ...
Page 78: ...Adjustment and Maintenance 4 4 22 ...
Page 106: ......
Page 138: ...Checklists and Logs Appendix D Measure gap between two levers near ZPM 9 24 ...
Page 143: ...Checklists and Logs Appendix D This Page is Intentionally Blank 9 29 ...
Page 144: ......