Checklists and Logs
Appendix D
supply panel to motor drive assembly.
Connect APD power cable (green Lemo connector) from power
supply panel to interferometer base “power” connector.
Make sure COIL switch on superspring controller is off. Connect
superspring cable (yellow Lemo connector) from power supply
panel to superspring.
Check superspring levels and release travel lock.
Adjust superspring position (0 – 20 mV) and turn coil switch on.
Adjust beam verticality and optimize fringe signal.
Check/set computer time. Edit fields in Process | Setup. Set
dropper controller to AUTO and initiate.
Table 9-2 FG5 Setup
9.3. Dropping Chamber Pump Down and
Bake-Out
Dropping Chamber Pump Down and Bake-Out
Set turbo pump for proper line voltage (see appendix A).
Place turbo pump on case lid and connect pump to dropper with
flexible stainless steel tube.
Remove plastic cap from exhaust mist collector. If the dropper is
under vacuum, keep the bellows valve shut. If the dropper has
9-5
Summary of Contents for Micro-g LaCoste FG5
Page 7: ...Table of Figures This Page is Intentionally Blank vii ...
Page 8: ......
Page 13: ...Design Components and Function 2 Figure 2 3 Side view of the dropping chamber 2 3 ...
Page 23: ...Design Components and Function 2 Figure 2 9 The Superspring 2 13 ...
Page 31: ...Design Components and Function 2 Figure 2 12 Rotation Monitor 2 21 ...
Page 32: ...Design Components and Function 2 This Page is Intentionally Blank 2 22 ...
Page 36: ...How to Set Up and Run the FG5 3 Figure 3 1 Superspring Interferometer Setup 3 4 ...
Page 56: ......
Page 59: ...Adjustment and Maintenance 4 4 3 ...
Page 78: ...Adjustment and Maintenance 4 4 22 ...
Page 106: ......
Page 138: ...Checklists and Logs Appendix D Measure gap between two levers near ZPM 9 24 ...
Page 143: ...Checklists and Logs Appendix D This Page is Intentionally Blank 9 29 ...
Page 144: ......