Stack Connection Location
The ventilation stacks connect to openings in the wall or roof. An optimal location is directly above
the corresponding stack connections on the roaster.
Refer to the
Mechanical Interface Control Documents
from Loring for:
• Exact dimensions and locations on the roaster.
• Stack elbow options for routing through existing openings.
Check local building codes for additional stack ventilation requirements.
Assistance with stack design is available through Loring upon request. Loring recommends
engaging with a stack design consultant to create details for complex site configurations.
Cooling
Vent
Stack
(hot air)