1.800.643.5596 • Lomanco, Inc. • lomanco.com
Subscribe on
YouTube
Find us on
BATH PRO
TM
Installation Instructions
IMPORTANT!
•
Installation of Lomanco Vents should comply with all
local codes and standards.
•
Do not install roof jack on a flat roof.
•
Do not use roof jack on a dryer exhaust vent.
•
WARNING! Sharp edges are exposed during
installation. Use gloves and other appropriate safety
equipment to avoid injury.
23/4”
13/4”
13/4”
ROOFING
CEMENT
Roof Cement
CUT AREA
Roof Jack OUTLINE
NAILS
LOMANCO
BATH PRO
TM
EXHAUST FAN ROOF JACK
FOR 3” & 4” ROUND
DUCTWORK
MODEL BRV34
Color Note: The black painted finish of the BRV34 can be used
as-is or as a primer coat for a color finish of your choice. Clean the
surface of all dirt, grease and oil before applying a color finish.
Use a high quality finish to best serve the conditions of your
application.
22160_0219
Figure 1 / Figura 1
Figure 2 / Figura 2
Figure 3 / Figura 3
Figure 4 / Figura 4
Figure 5 / Figura 5
3/4”
MAX.
3/4”
MÁX.
1,9 cm (0,75 po) max.
3/4”
MAX.
3/4”
MÁX.
1,9 cm (0,75 po) max.
CONTORNO de la cubierta para el techo
CONTOUR de la buse de toit
ÁREA DE CORTE
ZONE DE COUPE
Roof Jack
OUTLINE
CONTORNO de la
cubierta para el techo
CONTOUR de la buse
de toit
CUT AREA
ÁREA DE CORTE
ZONE DE COUPE
CEMENTO PARA TECHO
BITUME DE COLLAGE
CEMENTO PARA
TECHO
BITUME DE COLLAGE
CLAVOS
CLOUS
7cm (2,75 po)
4.45cm (1,75 po)
4.45cm (1,75 po)
INSTALLATION:
1. Determine the install location of the Lomanco Model BRV34 roof
jack. Comply with all local codes and standards.
2. Cut a hole in the roof to adequately accommodate the ductwork
diameter.
3. Affix ductwork a maximum of 3/4” above and parallel to the roof
surface. (Figure 1)
4. Position and center the roof jack over ductwork and mark the
outline of the flange. (Figure 2, Figure 3)
5. Cut shingles as shown allowing the shingles to fit around the
housing of the roof jack when installed. Apply roofing cement to
seal around the ductwork as shown below. (Figure 4)
6. Carefully slide the base of the roof jack under the shingles with
the screened opening pointing down towards the roof eave. Note
that some nails may have to be raised or removed to allow the
adapter to slide into place. Make sure the throat of the roof jack is
centered over the exposed ductwork. Fasten the base to the roof
decking with roofing nails located as shown below. (Figure 5)
7. Finish by sealing all seams and nails with roofing cement. Also
use roofing cement to fasten down loose edges of shingles. Make
certain the pest screen is in place.